Laserfiche WebLink
STI SP001 Annual Insuection Checklist <br /> General Inspection Information: <br /> Inspection Date: 8.27.25 Prior Inspection Date: Retain until date: 8.27.28 <br /> Inspector Name(print): Timothy Cowger Title: Plant Manager <br /> Inspector's Signature: <br /> Tank(s)inspected ID T-100,T-116 through T-120 Tfill through T-619 550-gallon diesel tank T 631 through T 633 <br /> Regulatory facility name Canary Renewables Coro -STK-EHS-POL-004 K <br /> Inspection Guidance: <br /> ➢ This checklist is intended as a model.Locally developed checklists are acceptable as long as they are substantially equivalent(as applicable). <br /> ➢ For equipment not included in this Standard,follow the manufacturer recommended inspection/testing schedules and procedures. <br /> ➢ The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure.This visual inspection does not require a Certified Inspector.It shall be <br /> performed by an owner's inspector per paragraph 4.1.2 of the standard. <br /> ➢ Promptly remove standing water or liquid discovered in the primary tank,secondary containment area,interstice,or spill container.Before discharge to the environment,inspect the <br /> liquid for regulated products or other contaminants and dispose of it properly. <br /> ➢ In order to comply with EPA SPCC(Spill Prevention,Control and Countermeasure)rules,a facility should regularly test liquid level sensing devices to ensure proper operation(40 CFR <br /> 112.8(c)(8)(v)). <br /> ➢ Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design,a Certified Inspector,or a tank manufacturer who will <br /> determine the corrective action.Note the non-conformance and corresponding corrective action in the comment section. <br /> ➢ Retain the completed checklists for at least 36 months. <br /> ➢ Complete this checklist on an annual basis,supplemental to the owner monthly-performed inspection checklists. <br /> ➢ Note: If a change has occurred to the tank system or containment that may affect the SPCC plan,the condition should be evaluated against the current plan requirement by a <br /> Professional Engineer knowledgeable in SPCC development and implementation. <br /> ITEM STATUS COMMENTS/DATE CORRECTED <br /> Tank Foundation/Supports <br /> 1 Free of tank settlement or foundation washout? { Yes ❑NO <br /> 2 Concrete pad or ring wall free of cracking and spatting? 2Yes ❑NO ❑N/A <br /> 3. <br /> Annual Checklist Page 1 of <br /> s <br />