My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2200 - Hazardous Waste Program
>
PR0521599
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 11:40:19 AM
Creation date
2/7/2026 10:16:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0521599
PE
2220 - SM HW GEN <5 TONS/YR
FACILITY_ID
FA0007787
FACILITY_NAME
7-ELEVEN INC #41341
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
4405 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by © Manufacturer Ej Industry Standard © Professional Engineer <br /> Test Type © Pressure ❑ Vacuum ❑I— Hydrostatic <br /> Test Equipment Used: <br /> Tank ID <br /> Tank Manufacturer <br /> Tank Capacity <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> 11 Tightness Test Results 0 Pass 0 Fail © Pass © Fail 97 Pass © Fail ❑ Pass 7 Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by LF Manufacturer ❑ Industry Standard © Professional Engineer <br /> Test Type © Pressure 17 Vacuum © Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results © Pass © Fail r] Pass ® Fail © Pass © Fail ❑ Pass r Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results 0 Pass P7 Fail L7 Pass r Fail 0 Pass © Fail I❑ Pass © Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.