Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10. TESTING AND MAINTENANCE Yes No NA Date last <br /> perfoemed <br /> Has monitoring system certfcation been completed within the past <br /> 12 months? 0 ❑ 6/13/24 <br /> Has spill container testing been completed within the past 6/13/24 <br /> 12 months" ❑ <br /> Has overfill prevention equipment inspection been completed within <br /> the past 6 months? ❑ ❑ s/13/24 <br /> Has secondary containment testing been completed within the past 6/24/24 <br /> 36 months? ❑ ❑ <br /> Has tank tightness testing been completed within required N/A <br /> timefrarnes? ❑ ❑ B <br /> Has line tightness testing been completed within the required N/A <br /> timeframes? ❑ ❑ <br /> Other Test / Maintenance ❑ ❑ 0 N/A <br /> Other Test / Maintenance: ❑ ❑ 0 N/A <br /> Other Test / Maintenarice: ❑ ❑ 0 N/A <br /> 11. FACILITY EMPLOYEE TRAINING Yes No � <br /> Have ail individuals performing facility employee duties received the required facility <br /> employee training within the past 12 months? ❑ <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> 1. See attached Alarm Response Worksheet. <br /> 2. L8 sensor replaced on 8/26/24. Site has 30 days to place sensor replacement monitor certification test results on site. <br /> 3. Initial Overfill prevention testing completed on 6/13/24. Passing retest completed on 7/26/24. <br /> 4. Employee trained on 9/6/24. See attached employee training roster. <br /> Ail answers marked "No"must be described by the designated LIST operator in Section 3- <br /> Page 4 of 4 <br /> 7-11 -41341 -09/06/2024 <br />