Laserfiche WebLink
9/10/2025 <br />PLUMBING <br />SHEET PI00 - PLUMBING PLAN WASTE & GAS <br />SHEET P700-PLUMBING DETAILS <br />ELECTRICAL <br />SHEET E110- ELECTRICAL POWER PLAN <br />SHEET E600 - ELECTRICAL SCHEDULES <br />Page 2 of 2 <br />Keynote 3 was revised to indicate that the fryer and rice cooker receptacles shall be connected to the circuits as <br />shown. <br />Keynote 21 was revised to indicate that the dual-sided plancha receptacles shall be connected to the circuits as <br />shown. <br />Keynote 55 was added to indicate the requirement of providing a 60A, 6-pole, or (2) 60A, 3-pole contactors for <br />plancha control. <br />Keynote 56 was added to indicate the installation of Littlefuse Shock-Block GFCI devices, furnished by TPS, in an <br />accessible location on the wall above the panel to protect the circuits feeding the dual-sided plancha <br />receptacles. <br />Added outlets for DSP to cookline. Added notes for shock block and contactor by panels. <br />The name and load in amperes of circuit B-21 were updated. <br />Noted for all cookline receptacles to be at 24" AFF. <br />Two dual-sided plancha receptacles were added to the circuits on B-49, B-51, B-53, and B-50, B-52, B-54. <br />The B-49 circuit for the soda system dispenser was moved to circuit B-20. <br />Updated rice cooker and fryer circuit names and amperages (The amp draw of the new dual-vat <br />fryer is significantly higher than the previous single-vat fryer). <br />The circuits for the 2 dual-sided plancha were added to the circuit plan on B-49, B-51, B-53, and B-50, B-52, B-54. <br />Total panel loads updated regarding previous updates. <br />Keynote 8 was revised for the updated rice cooker. <br />Keynote 19 was revised for the updated fryer. <br />Keynote 20 was removed. <br />Gas distribution diagram (gas riser) was updated. <br />Plumbing gas connection schedule was updated per updated cookline. <br />Gas supply lines shown on floor plan were updated per updated cookline. <br />Architecture. <br />Design. <br />Relationships. <br />Detail 6 was updated to reflect updated fryer connections. <br />On Detail 1, Updated water heater detail note #9.