My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2800 - Aboveground Petroleum Storage Program
>
PR0515788
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 8:33:31 AM
Creation date
2/13/2026 8:31:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0515788
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0000482
FACILITY_NAME
3 b's truck & auto plaza
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Lodi
Zip
95242
APN
0000273464
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
14749 N Thornton RD Lodi 95242
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E S T I M AT E <br />All i ance General Eng ineeri n g Inc. <br />L icense 1091265 <br />1231 Wigeon Dr <br />Patterso n , CA 95363 <br />alli anceeng ineeri n g209@gmail.com <br />+1 (209) 535-5363 <br />http ://alli ancegeneral engineering.c <br />om <br />B il l to <br />Mr. Ben Khat irine <br />14749 Thornt on Rd. Lodi CA 95242 <br />Shi p to <br />Mr. Ben Khat irine <br />14749 Thornt on Rd. Lodi CA 95242 <br />Es timate det ails <br />Es timate no.: 1069 <br />Es timate dat e: 08/28/2025 <br />#Dat e Product or service Description Qt y Rat e Amount <br />1.2 man la bor- Regula r Install over ll a la rms on clock gauge <br />with sensors in the annular space on <br />f our tanks route corresponding conduit, <br />to the boxes f rom sensor a lso replace <br />to emergency vans. One on ea ch diesel <br />tank. One was broken a nd the other <br />one would not open. Wa s able to open <br />the rest of a ll E-vents. And lube seals. <br /> <br />1 $3,500.00 $3,500.00 <br />2 .Electrical 1 $8 00.00 $800.00 <br />3.Gas/Mileage Rate 1 dollar per mile 1 $2 2 0.00 $220.00 <br />4.10/2 2 /2025 1 man labor Ran electrical a cross top insta lled <br />boxes, secure electrical runs, and zip tie <br />as much as we could to ma ke it look <br />stra ight installed four liquid sensors on <br />the annula r one f or each tank. Also <br />installed new M orrison 918 clock <br />guages a nd set them to their <br />corresponding 95% shut o with ta nk <br />chart provided also installed two <br />emergency events. All of the tanks had <br />vents that were good only repla ced the <br />two diesel ones prima ries. <br />1 $0.00 $0.00 <br />Total $4,520.00 <br />Accepted da te Accepted by
The URL can be used to link to this page
Your browser does not support the video tag.