Laserfiche WebLink
TABLE 3 <br />Soil Boring and Well Construction Details <br />Stockton Charter Way Commingled Plume <br />440, 441, and 508 West Charter Way and 1444 South Lincoln Street, Stockton, CA <br />Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 5 of 10 Stantec <br />TOC <br />Borehole <br />Casing <br />Bentonite Seal <br />Cement Seal <br />Water - <br />Installation <br />Total Depth <br />Casing <br />Slot Size <br />Screened Interval <br />Filter Pack Interval <br />Location I.D. <br />Elevation <br />Diameter <br />Diameter <br />Interval <br />Interval <br />Bearing <br />Comments <br />Date <br />(feet bgs) <br />Material <br />(inches) <br />(feet bgs) <br />(feet bgs) <br />(feet) <br />(inches) <br />(inches) <br />(feet bgs) <br />(feet bgs) <br />Zone <br />Air Sparge Wells (AS) <br />AS -1 <br />10/31/11 <br />44.5 <br />10 <br />2 <br />SCH. 40 PVC <br />0.020 <br />39-41 <br />37-41.5 <br />34-37 <br />0-34 <br />41.5-44.5 It bgs filled with sluff <br />AS -2 <br />11/04/11 <br />30.5 <br />10 <br />2 <br />SCH. 40 PVC <br />0.020 <br />25-27 <br />23-27.5 <br />20-23, 28-30.5 <br />0-20 <br />27.5-28 ft bgs filled with sluff <br />AS -3 <br />10/22/12 <br />39 <br />10 <br />2 <br />SCH. 40 PVC <br />0.020 <br />35-37 <br />33-39 <br />31-33 <br />0-31 <br />AS -4 <br />10/22/12 <br />38 <br />10 <br />2 <br />SCH. 40 PVC <br />0.020 <br />34-36 <br />32-38 <br />30-32 <br />0-30 <br />AS -5 <br />10/23/12 <br />37 <br />10 <br />2 <br />SCH. 40 PVC <br />0.020 <br />31-33 <br />29-35 <br />27-29, 35-37 <br />0-27 <br />AS -6 <br />10/18/12 <br />34.5 <br />10 <br />2 <br />SCH. 40 PVC <br />0.020 <br />28-30 <br />26-32 <br />24-26, 32-34.5 <br />0-24 <br />AS -7 <br />10/19/12 <br />32 <br />10 <br />2 <br />SCH. 40 PVC <br />0.020 <br />28-30 <br />26-32 <br />24-26 <br />0-24 <br />AS -8 <br />10/17/12 <br />41 <br />10 <br />2 <br />SCH. 40 PVC <br />0.020 <br />30-32 <br />28-34.5 <br />26-28, 34.5-41 <br />0-26 <br />AS -9 <br />10/17/12 <br />36 <br />10 <br />2 <br />SCH. 40 PVC <br />0.020 <br />32-34 <br />30-36 <br />28-30 <br />0-28 <br />AS -10 <br />10/23/12 <br />38.5 <br />10 <br />2 <br />SCH. 40 PVC <br />0.020 <br />34-36 <br />32-38.5 <br />30-32 <br />0-30 <br />AS -11 <br />10/19/12 <br />32 <br />10 <br />2 <br />SCH. 40 PVC <br />0.020 <br />28-30 <br />26-32 <br />24-26 <br />0-24 <br />AS -12 <br />10/24/12 <br />37 <br />1 10 <br />1 2 <br />1 SCH. 40 PVC <br />1 0.020 <br />1 33-35 <br />1 31-37 <br />1 29-31 <br />0-29 <br />Vapor Extraction Wells (VE) <br />VE -1 <br />11/04/11 <br />16.5 <br />10 <br />4 <br />SCH. 40 PVC <br />0.020 <br />11-16 <br />9-16.5 <br />6-9 <br />0-6 <br />VE -2 <br />10/16/12 <br />16 <br />10 <br />4 <br />SCH. 40 PVC <br />0.020 <br />10.5-15.5 <br />10-16 <br />7-10 <br />0-7 <br />VE -3 <br />10/16/12 <br />17 <br />10 <br />4 <br />SCH. 40 PVC <br />0.020 <br />11.5-16.5 <br />11-17 <br />8-11 <br />0-8 <br />VE -4 <br />10/15/12 <br />16 <br />10 <br />4 <br />SCH. 40 PVC <br />0.020 <br />10.5-15.5 <br />10-16 <br />7-10 <br />0-7 <br />VE -5 <br />10/16/12 <br />16 <br />10 <br />4 <br />SCH. 40 PVC <br />0.020 <br />10.5-15.5 <br />10-16 <br />7-10 <br />0-7 <br />VE -6 <br />10/15/12 <br />16 <br />1 10 <br />1 4 <br />SCH. 40 PVC <br />0.020 <br />10.5-15.5 <br />10-16 <br />7-10 <br />0-7 <br />Piezometers (PZ) <br />PZ -111/04/11 <br />16.5 <br />10 <br />4 <br />SCH. 40 PVC <br />0.020 <br />11-16 <br />9-16.5 <br />5.5-9 <br />0-5.5 <br />PZ -2 <br />11/04/11 <br />16.5 <br />10 <br />4 <br />SCH. 40 PVC <br />0.020 <br />11-16 <br />9-16.5 <br />5.5-9 <br />0-5.5 <br />Cone Penetrometer Test (CPT) <br />CPT -1 <br />07/23/05 <br />73 <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />CPT -2 <br />07/20/05 <br />87 <br />CPT -3 <br />07/20/05 <br />92 <br />CPT -4 <br />07/19/05 <br />88 <br />CPT -5 <br />07/18/05 <br />60 <br />CPT -6 <br />07/23/05 <br />59 <br />CPT -7 <br />07/23/05 <br />57 <br />CPT -8 <br />07/21/05 <br />100 <br />CPT -9 <br />07/21/05 <br />58 <br />CPT -10 <br />07/23/05 <br />67 <br />Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 5 of 10 Stantec <br />