|
SELECTEDF
<br /> WELL DESTRUCTION STANDARDS
<br /> ASTM Book of Standards, 1993: Standard guide for decommissioning of ground-water
<br /> wells, vadose zone monitoring devices, boreholes, and other devices for
<br /> environmental activities, Designation D5299-92 p. 163-178.
<br /> AWWA Standard for Water;Wells, 2006: Decommissioning of test holes, partially
<br /> completed wells, and abandoned wells, ANSI/AWWA A100-06, Section 4-10.
<br /> California Department of dater Resources, 1981 Water well standards, State of
<br /> California Bulletin 7 -81, 92 p.
<br /> California Department of Water Resources, 1991: California well standards, supplement
<br /> to Bulletin 74-81, Bulletin 74-90, 82 p.
<br /> Los Angeles County Dept. of Health Services, 2001: Environmental health requirements
<br /> for well construction/decommissioning; Memorandum dated January 1, 2001.
<br /> National Ground Water Association, 211: ANSI/ GWA-01-07 Water well construction
<br /> standard, Section 11, permanent well and test hole decommissioning, draft
<br /> document dated April 1, 2011, 42 p.
<br /> Nebraska Grout Task Force, 2009: In-situ study of ground materials 2001-2006 and 2007
<br /> Dye tests, Educational Circular EC-20, Conservation and Survey Division, School
<br /> of Natural Resources, Institute of Agriculture and Natural Resources, University of
<br /> Nebraska, 34 p.
<br /> Santa Clara Valley Water District, 2010: Standards for the construction, destruction, and
<br /> maintenance of wells and other deep excavations in Santa Clara County; draft
<br /> document dated January 2010, 45 p.
<br /> S.A. Smith Consulting Services and Wisconsin Water Well Association, 1994: Well and
<br /> borehole sealing—importance, materials, methods, and recommendation for
<br /> decommissioning, (based primarily on State of Wisconsin ordinances).
<br /> State of Pennsylvania, Dept. of Environmental Protection, 2002: Water Code, Chapter 7,
<br /> well abandonment procedures, January 2002, 6 p.
<br /> Transportation Research Board, National Research Council, 1995: Recommended
<br /> guidelines for sealing geotechnical exploratory holes.
<br /> U.S. Environmental Protection Agency, Office of Water Supply, 1976: Manual of water
<br /> well construction practices, Article 56, permanent well and test hole abandonment,
<br /> Revised 4/27/2013
<br /> ARTICLE 299—DESTRUCTION OF WATER WELLS —Page 7 of 8 (Revised 4/27/2013)
<br />
|