My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
950
>
2900 - Site Mitigation Program
>
PR0547725
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 2:52:31 PM
Creation date
2/17/2026 11:14:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0547725
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027181
FACILITY_NAME
PROPOSED MONITORING WELL SITE
STREET_NUMBER
950
STREET_NAME
STEWART
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
2121007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
950 STEWART RD LATHROP 95330
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A CITY OF LATHROP <br /> 1 SPECIAL PROVISIONS......................................................................................................................1 <br /> 1.1 GENERAL.......................................................................................................................................1 <br /> 1.1.1 ENGINEER............................................................................................................................................ 1 <br /> 1.1.2 TERMINATION AND ALTERNATIVE WELL....................................................................................................1 <br /> 1.1.3 PRELIMINARY TEST HOLE AND MONITORING WELL DESIGN..........................................................................1 <br /> 1.1.4 PERMITS AND NOTIFICATIONS .................................................................................................................1 <br /> 1.1.5 SERVICES FURNISHED BY THE CITY............................................................................................................2 <br /> 1.1.6 REFERENCE POINTS................................................................................................................................2 <br /> 1.1.7 WORK AREA RESTRICTIONS.....................................................................................................................2 <br /> 1.1.8 CONSTRUCTION INSPECTION ...................................................................................................................3 <br /> 1.1.9 SITE SECURITY.......................................................................................................................................3 <br /> 1.1.10 WATER FOR DRILLING............................................................................................................................3 <br /> 1.1.11 NUISANCE WATER, DEVELOPMENT WATER,AND DRILL CUTTINGS................................................................3 <br /> 2 TECHNICAL PROVISIONS.................................................................................................................5 <br /> 2.1 GENERAL REQUIREMENTS...........................................................................................................5 <br /> 2.1.1 SCOPE OF WORK...............................................................................................................................5 <br /> 2.1.2 LOCATION AND LOCAL CONDITIONS.................................................................................................6 <br /> 2.1.3 DRILLING FLUID CONTROL PROGRAM ..............................................................................................6 <br /> 2.2 MATERIALS..................................................................................................................................8 <br /> 2.2.1 CERTIFICATES OF COMPLIANCE........................................................................................................8 <br /> 2.2.2 MATERIALS SPECIFICATIONS.............................................................................................................9 <br /> 2.3 TEST HOLE DRILLING AND MONITORING WELL CONSTRUCTION .................................................10 <br /> 2.3.1 MOBILIZATION................................................................................................................................10 <br /> 2.3.2 TEST HOLE DRILLING .......................................................................................................................10 <br /> 2.3.3 GEOPHYSICAL LOGGING..................................................................................................................12 <br /> 2.3.4 TEST HOLE REAMING ......................................................................................................................12 <br /> 2.3.5 WELL CASING AND SCREEN.............................................................................................................13 <br /> 2.3.6 GRAVEL ENVELOPE AND INTERMEDIATE BENTONITE SEALS ..........................................................14 <br /> 2.3.7 ANNULAR SEAL................................................................................................................................15 <br /> 2.3.8 WELL DEVELOPMENT......................................................................................................................16 <br /> 2.3.9 SURFACE COMPLETION...................................................................................................................16 <br /> 2.3.10 STANDBYTIME................................................................................................................................18 <br /> 2.3.11 SITE CLEAN-UP, RESTORATION,AND RECORDS..............................................................................18 <br /> 2.3.12 TEST HOLE ABANDONMENT ...........................................................................................................18 <br /> 2.3.13 CUTTINGS AND FLUID CONTAINMENTAND DISPOSAL...................................................................19 <br /> 2.3.14 REJECTED BOREHOLE OR WELL.......................................................................................................19 <br /> LUHDORFF&SCALMANINI <br /> CONSULTING ENGINEERS I <br />
The URL can be used to link to this page
Your browser does not support the video tag.