My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHIPLEY
>
0
>
2900 - Site Mitigation Program
>
PR0548381
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 12:03:09 PM
Creation date
2/17/2026 12:01:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548381
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0027626
FACILITY_NAME
AMERICAN SODA ASH TERMINAL
STREET_NUMBER
0
STREET_NAME
SHIPLEY
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
SHIPLEY RD STOCKTON 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Denmar US American Soda Ash Terminal at the Port of Stockton <br /> 19113.000.001 Work Plan for Groundwater Characterization <br /> Upon completion of the testing, we will prepare a summary letter and coordinate with the team <br /> regarding benefits of different shoring/dewatering options prior to submittal of the NOI. <br /> SCHEDULE <br /> We will begin each day on-site by meeting to review site safety. Necessary removal or unlocking <br /> of fences or gates and permission to enter the site must be secured by the client prior to our field <br /> activities. A summary of the work sequence is presented in Table 1, below. <br /> TABLE 1: Summary of Sequence of Work <br /> ITEM BY TYPICAL TIME <br /> Site reconnaissance and marking of exploration ENGEO 'h day <br /> locations with wooden construction stakes <br /> USA clearance Various utility owners 2 days <br /> Hydropunch and Backfill Contractor and ENGEO '/2- 1 day <br /> Sampling from existing wells ENGEO 1 day <br /> SITE CONTACTS <br /> The following list includes points of contact and the telephone numbers and addresses for personnel <br /> involved with the exploration: <br /> TABLE 2: Points of Contact <br /> TELEPHONECOMPANY CONTACT PROJECT TITLE <br /> NUMBER <br /> Denmar US Bill Peterson Managing Director and Client 415-497-7754 <br /> ENGEO Incorporated Jeff Fippin Principal-In-Charge and 925-570-7970 <br /> Project Manager <br /> ENGEO Incorporated Victoria Drake Health and Safety Manager 626-408-4436 <br /> ENGEO Incorporated Cody Johnson Project Geologist 925-786-7896 <br /> PeneCore Drilling Xavier Green Hydropunch Contractor 916-753-5127 <br /> HEALTH AND SAFETY <br /> Our personnel and subcontractors will follow the health and safety precautions in this section and <br /> Safety and Health procedures set forth by OSHA. All field personnel will be required to have <br /> access to protective equipment. Protective equipment will include, but is not limited to: <br /> • Hard hat <br /> • Hi-visibility safety vest <br /> • Safety boots <br /> • Safety eyewear <br /> • Gloves <br /> Prior to work, the exploration subcontractor performing the hydropunch will perform a safety <br /> orientation with our field personnel that describes working conditions around the excavation <br /> equipment and explains the basic operation of the equipment being used. <br /> ENGEOApril 6, 2023 <br /> Expect Excellence <br />
The URL can be used to link to this page
Your browser does not support the video tag.