My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2900 - Site Mitigation Program
>
PR0542398
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2026 8:49:30 AM
Creation date
2/17/2026 12:07:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542398
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024360
FACILITY_NAME
JAMAR SERVICE STATION
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
1572611
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
4075 E MAIN ST STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rs 2002051 July 17 2020 Special Conditions for -2- <br /> SPECIAL CONDITIONS FOR ENCROACHMENT PERMIT <br /> ATC—EAST MAIN ST. <br /> ENCROACHMENT PERMIT and plating plan suitable for traffic loadings shall be prepared by a registered civil engineer and <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 10 minutes. submitted for prior approval by the County. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backflled or 13. The contractor shall use San Joaquin County Improvement Standard R-29 when backfilling <br /> plated. During working hours,two-way traffic control shall be maintained with one lane open and trenches/bell holes within the County right-of-way. Where the existing road structural section is <br /> appropriate flaggers. below standard,a minimum section of 3 inches of asphalt concrete over 8 inches of aggregate <br /> 2. Access to allproperties shall be maintained at all times except when work is occurring at the base shall be required. <br /> a 14. County roads shall be kept clean from mud and debris at all times along the access points and <br /> access point. Minimal delays will be allowed to provide access within the work zone area. work zone areas during entire project. All standard roadway striping and signage shall be clearly <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the visible,maintained and restored throughout the construction zone during and after the project. <br /> contractor shall be replaced with in-kind or better materials. <br /> 15. In addition to standard dust control measures,streets shall be maintained in a Gear condition, <br /> 3. Residents and businesses shall be notified in writing,as approved by the County,48 hours in free of dirt, mud and debris during construction activities. The contractor shall provide daily,and <br /> advance of any impacts to their access. as determined to be necessary by County inspectors,street sweeping using a modern <br /> 4. Any areas where parking is to be restricted shall have signs noting the restrictions in place at mechanical or vacuum-assisted street sweeper. <br /> least 48 hours in advance. 16. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br /> S. School Buses shall be passed through the work zone with minimal delays. <br /> 6. Existing fences shall not be removed without written consent of the property owner.Such consent <br /> shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br /> kind or better materials. Restored fences shall not encroach into County right-of-way. <br /> 7. Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br /> March 31 without prior authorization from the San Joaquin County Department of Public Works <br /> Field Engineering Division,contact them at 209-953-7421. <br /> 8. All destroyed or obliterated pavement markings must be replaced in kind by the pennittee.Typical <br /> pavement markings include but not limited to lane lines,centerlines,stop and stop ahead <br /> legends,limit lines,raised pavement markers and miscellaneous delineators. <br /> 9. The Permittee is responsible for the preservation of survey monuments located within the area of <br /> work herein permitted. Prior to the start of construction,survey monuments that potentially may <br /> be disturbed shall be located and referenced by a Licensed Land Surveyor,and a Corner Record <br /> fled with the County Surveyor. Any Survey Monuments disturbed during the course of <br /> construction shall be reestablished by a Licensed Land Surveyor and another Comer Record filed <br /> with the County Surveyor.(Land Surveyors'Act Section 8771) <br /> 10. All future maintenance of the pipeline and related facilities within the County right-of-way,will <br /> require a San Joaquin County Encroachment Permit. <br /> 11. Trenches/bell holes shall be maintained in a smooth and even condition to the satisfaction of the <br /> County throughout the project limits at all times. <br /> 12. All trenches/bell holes shall be completely backs lled or shored and plated at the end of each <br /> workday,and the roadway restored to two-way traffic, If plating is to be used,a trench shoring <br />
The URL can be used to link to this page
Your browser does not support the video tag.