Laserfiche WebLink
September 2023 <br /> Project No. 96-0235 AdvancedGeo <br /> Page 3 of 7 An fmproyee OwnedCompsrry <br /> =SUPPORTZONE SUPPORT FUNCTIONS A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> HARD HAT <br /> STEEL-TOED BOOTS <br /> LEVEL D: HALF-FACED RESPIRATOR <br /> GLOVES <br /> SAFETY GLASSES <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate <br /> canister for use with the involved substances and concentrations. No down-grading <br /> changes of the specified levels of protection shall be made without the approval of the <br /> site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Daniel Villanueva Oversee operations <br /> FIELD CREW. TASK: <br /> Maxwell Niemeyer Collect samples <br /> 7.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used: <br /> HAND GRIPPING THROAT: OUT OF AIR; CANNOT BREATHE <br /> GRIP PARTNER'S WRIST OR BOTH LEAVE AREA IMMEDIATELY <br /> HANDS AROUND WAIST: <br /> HANDS ON TOP OF HEAD: NEED ASSISTANCE <br /> THUMBS UP: OK; I AM ALRIGHT; I UNDERSTAND <br />