Laserfiche WebLink
TABLE 1 <br /> SUMMARY OF WELL CONSTRUCTION DETAILS <br /> West Clay Properties <br /> 639 West Clay Street, Stockton, California <br /> Borehole Casing Casing Slot Size Casing Screen Filter Pack Bentonite <br /> Total Depth Hydrogeologic Grout <br /> Well ID Install Date Diameter Diameter Elevation Interval Interval Sand Type Interval <br /> (feet) Unit Material (inch) � Interval(feet) <br /> (inch) (inch) (feet NAVD) (feet) (feet) (feet) <br /> MW-1 03-1994 60 2 8 2 PVC 0.020 6.31 40-60 33 to 60 unk 31 to 33 0 to 31 <br /> MW-2 03-1994 60 2 8 2 PVC 0.020 6.83 40-60 34 to 60 unk 32 to 34 0 to 32 <br /> MW-3 03-1994 60 2 8 2 PVC 0.020 6.42 30-60 26 to 60 unk 24 to 26 0 to 24 <br /> MW-4 05-23-1997 33 1 8 2 PVC 0.020 7.35 13-33 11 to 33 #3 9 to 11 0 to 9 <br /> MW-5 05-23-1997 35 1 8 2 1 PVC 0.020 7.49 15-35 1 13 to 35 #3 11 to 13 0 to 11 <br /> MW-6A 08-26-1998 30 1 10 2 PVC 0.020 7.08 10-30 8 to 30 #3 6.5 to 8 0 to 6.5 <br /> MW-61B 08-26-1998 45 2 10 2 PVC 0.020 6.97 40-45 38 to 45 #3 35 to 38 0 to 35 <br /> MW-7 08-26-1998 30 1 8 2 PVC 0.020 7.34 10-30 8 to 30 #3 6 to 8 0 to 6 <br /> MW-8A 08-27-1998 30 1 10 2 PVC 0.020 6.80 10-30 8 to 30 #3 6 to 8 0 to 6 <br /> MW-8B 08-27-1998 45 2 10 2 1 PVC 0.020 6.67 40-45 38 to 45 #3 35 to 38 0 to 35 <br /> MW-9 10-21-1999 45 2 8 2 PVC 0.020 5.26 40-45 38 to 45 #3 36 to 38 0 to 36 <br /> MW-10 10-21-1999 30 1 8 2 PVC 0.020 5.77 10-30 8 to 30 #3 6 to 8 0 to 6 <br /> MW-11A 07-25-2000 30 1 8 2 PVC 0.020 5.08 10-30 8 to 30 #3 6 to 8 0 to 6 <br /> MW-11 B 07-25-2000 45 2 8 2 PVC 0.020 5.46 40-45 38 to 45 #3 36 to 38 0 to 36 <br /> MW-12A 07-26-2000 30 1 8 2 PVC 0.020 5.04 10-30 8 to 30 #3 6 to 8 0 to 6 <br /> MW-12B 07-26-2000 45 2 8 2 PVC 0.020 5.28 40-45 38 to 45 #3 36 to 38 0 to 36 <br /> MW-13A 07-26-2000 30 1 8 2 PVC 0.020 5.90 10-30 8 to 30 #3 6 to 8 0 to 6 <br /> MW-13B 07-26-2000 45 2 8 2 PVC 0.020 5.95 40-45 38 to 45 #3 36 to 38 0 to 36 <br /> MW-14A 11-12-2002 30 1 8 2 PVC 0.020 5.75 10-30 8 to 30 #3 6 to 8 0 to 6 <br /> MW-14B 11-12-2002 70 3 8 2 PVC 0.020 5.43 65-70 63 to 70 #3 60 to 63 0 to 60 <br /> MW 15A 11 13 2002 30 1 8 2 PVC 0.020 5.38 10 30 8 to 30 #3 6 to 8 0 to 6 <br /> MW-15B 11-13-2002 70 1 3 8 2 PVC 0.020 5.46 65-70 63 to 70 #3 60 to 63 1 0 to 60 <br />