My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
701
>
2900 - Site Mitigation Program
>
PR0529434
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 2:14:55 PM
Creation date
2/17/2026 2:01:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0529434
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0019555
FACILITY_NAME
SOUTH POINTE DEVELOPMENT SITE (CITY OF STKN REDEVELOPMENT AGENCY)
STREET_NUMBER
701
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
13726016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
701 W WEBER AVE STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1-Soil Sampling Analytical Program-Boreholes 1 through 18 Advanced Through Overlying Soil Pile <br /> South Pointe Project <br /> 701,705,833,and 855 West Weber Avenue <br /> Stockton,California <br /> Primary Soil COCs Additional Soil COCS 3 <br /> Borehole ID Soil Pile Thickness Borehole Depth 1 Sample Intervals Z Soil Pile/Native Pb/Co/Hg OCPs PAHs VOCs PCBs Cr' <br /> 1 0.5' 9.5' 0 Fill X X <br /> 0.5 Native X X <br /> 4.5 Native X X <br /> 9.5 Native H H <br /> 2 1.5' 10.5' 0 Fill X X X X X <br /> 1.5 Native X X X X X X <br /> 5.5 Native X X X <br /> 10.5 Native H H <br /> 3 0.5' 9.5' 0 Soil Pile X X <br /> 0.5 Native X X <br /> 4.5 Native X X <br /> 9.5 Native H H <br /> 4 3' 12' 0 Soil Pile X X X X X <br /> 1.5 Soil Pile X X X <br /> 3 Native X X X X X <br /> 7 Native X X X <br /> 12 Native H H <br /> 5 2' 11' 0 Soil Pile X X <br /> 1 Soil Pile X X <br /> 2 Native X X <br /> 6 Native X X <br /> 11 Native H H <br /> 6 1' 10' 0 Soil Pile X X X X X X <br /> 1 Native X X X X X <br /> 5 Native X X X <br /> 10 Native H H <br /> 7 2.5' 11.5' 0 Soil Pile X X <br /> 2 Soil Pile X X <br /> 2.5 Native X X <br /> 6.5 Native X X <br /> 11.5 Native H H <br /> 8 2.5' 11.5' 0 Soil Pile X X X X X <br /> 2 Soil Pile X X X <br /> 2.5 Native X X X X X <br /> 6.5 Native X X X <br /> 11.5 Native H H <br /> Stantec 1 of 1/17/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.