My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2320
>
2300 - Underground Storage Tank Program
>
PR0231084
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2026 1:46:07 PM
Creation date
2/20/2026 11:48:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231084
PE
2361 - UST FACILITY
FACILITY_ID
FA0006447
FACILITY_NAME
PAUL OIL COMPANY INC
STREET_NUMBER
2320
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12521030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
2320 N EL DORADO ST STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SN J O A Q U N Environmental Health Department <br /> C O U N T Y-._.-r._.. <br /> UST SYSTEM RETROFIT OR REPAIR <br /> 1. Site map enclosed? YES [] NO[] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced, Ensure a copy of <br /> the"Site Health and Safety Plan" is available on the jobsite as required by Title& <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br /> hour this will be done. (if adding piping, UDC's, or other UST equipment, or performing tank top upgrade. <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br /> Remove all float and chain devises <br /> Use Bravo plug kits and expoxy to seal <br /> Install stand alone sensors in UDC`s <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> 12) Brava 62K-P Plug Kits with EPIOORF Epoxy <br /> 8) 2)Veeder-Root 847990-001 Non-Discriminating Stand Alone Dispenser Pan Sensor <br /> 5. Decontamination Procedures: <br /> a. will piping be decontaminated prior to removal? YES [] NO[j <br /> b. Identify contractor performing decontamination: <br /> Name Phone[. <br /> Address City Zip <br /> 4W6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.