My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2320
>
2300 - Underground Storage Tank Program
>
PR0231084
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2026 1:46:07 PM
Creation date
2/20/2026 11:48:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231084
PE
2361 - UST FACILITY
FACILITY_ID
FA0006447
FACILITY_NAME
PAUL OIL COMPANY INC
STREET_NUMBER
2320
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12521030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
2320 N EL DORADO ST STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IN1,STRUCTIONS FOR SEALING B-2000 <br /> FLOAT CUP RESERVOIRS <br /> Approved.materials. Brava FRP Plug and Bravo Epoxy Kit <br /> 1) Remove all liquids, debris and contaminants from the interior of the B-2000 UDC. <br /> 2) Remove the float and float arras assembly so it is clear of the float cup area. <br /> 3)Abrade and clean up the float clip area. Remove mineral buildup, dirt and-any other debris, if rust <br /> is present, be cautious to not cut yourself, or bend any metal inwards. Use a wire bristle brush to rough <br /> up and smooth out rusty areas if present. <br /> 4) Clean the top edge of the float cup where it intersects with the bottom floor of the B-2000 UDC. <br /> 5) keep the float cup area dry. if water is present under the cup, or it is flowing up into the <br /> containment sump, inject a water barrier Polyurethane foam or filler in order to stop the flow of liquid. <br /> 6) Ensure the float cup and interior of the sump is completely clean and absolutely dry prior to <br /> adhesive application. <br /> 7) Ensure that the exterior of the fiberglass float cup <br /> contaminants. Clean with acetone to be certain and maintain a clean and dry sateprinfs, debris and <br /> 8)Apply mixed Bravo adhesive generously to the bottom and outside edges of the fiberglass flo <br /> Plug, applying a heavy amount around the lower half.,Use chip brush to wet out thenterior i at cup <br /> existing float cup area with adhesive as well. of the <br /> 9) Insert the plug into the float cup and press firmly, rotating it until the float cup bottoms <br /> should have applied enough adhesive so that it oozes out. Press it as far down as you can until the <br /> tole edge of the plug is flush with the bottom floor of the B-2000 UDC. e <br /> 10) Using the chip brush,-spread around or apply adhesive at the seam between the I <br /> bottom floor of the B-2000 UDC where they intersect. Aug and the <br /> 11) Allow a full cure of 8 hours at or above 70°F Do not allow the adhesive to come in con <br /> water or moisture while it is curing. tact with <br /> 12) Water test the UDC per typical procedures. <br /> . ,.. .... .. . - ..... . .. :. _ ii-B2000-PLUG-13A <br /> Ob <br /> wwvu,sBRAva.con made' <br /> .1' L:c1'Ff{ic'r <br /> 800-AT BRA O In US �Y�3EN <br /> MM H�n <br />
The URL can be used to link to this page
Your browser does not support the video tag.