My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1120
>
2900 - Site Mitigation Program
>
PR0543053
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 1:34:51 PM
Creation date
2/23/2026 1:17:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543053
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024606
FACILITY_NAME
FORMER KNOWLES STATION
STREET_NUMBER
1120
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07749027
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1120 W HAMMER LN STOCKTON 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tylor McMillan's Well Service <br /> 9530 Hageman Rd. STE B#349 Bakersfield CA,93312 <br /> Phone: (916)761-5224 Email:tylor@wellblaster.com <br /> Website:www.wellblaster.com <br /> Date: May 18,2023 <br /> BLASTING WORK PLAN <br /> Well:MW2 Location: 1120 W.Hammer Lane Plan date and time: Pending <br /> Casing 2-inch ID PVC to 65 feet Stockton,CA <br /> Sealing pipe Boosters <br /> GL Density g/cc 1.55 g/cc <br /> Detonation Velocity 24,000 ft/s 7,315 m/s <br /> Casing Diameter 2 inches <br /> Charge Wt. 0.15 Kg 150 grams <br /> 10, Detonation pressure 207 k/bar <br /> Total energy ea. 13,997 k/bar <br /> Pressure at casing 3,341.48 k/bar 50,018,545 psi <br /> Pressure at 10 feet 0.00 29 psi <br /> 20' Explosive Cord <br /> Density g/cc 1.60 g/cc <br /> Detonation Velocity 22,000 ft/s 6,706 m/s <br /> Casing Diameter 2 inches <br /> Grains 25 gr/ft 1.62 g/ft <br /> 3 0' <br /> Detonation pressure 180 k/bar <br /> Total energy pef ft. 11 k/bar <br /> Detonator placed at 35 feet Pressure at casing 3.48 k/bar 52,062 psi <br /> *These are estimated pressure for a empty well <br /> 40' Site procedure <br /> 1. Check site and measure well depth <br /> 2. Clear work site of all unessential personal <br /> 3. Lower charges and drop pipe into the well <br /> 4. Pump sealing material to top of well <br /> 5. Check and clear blast area(sound blast warning) <br /> 50' Detonating Cord 6. Arm explosives <br /> Start 35 feet 7. Confirm area clear(final blast warning) <br /> Intervals Linear 8. Detonate charge <br /> End 65 feet 9. Check hole and sound all clear <br /> Strength 25 grain 10. Refill cement to top of well to form a mushroom cap <br /> 60' Total 30 feet <br /> Total Explosives Name of Blaster Preparing Plan: Tylor McMillan <br /> 0.101 lbs. <br /> *Tylor McMillan's Well Service reserves the right to change or modify the charge in <br /> any way necessary to maintain the safety of all personnel onsite and in surrounding <br /> 70' areas. <br /> 80, <br /> 90, <br />
The URL can be used to link to this page
Your browser does not support the video tag.