Laserfiche WebLink
Boyd, Grace <br /> rzinnowaterboame ccgor> <br /> Tot Lehman, Andras <br /> to Madicia. Michael. Shelton. Kinatinnimuhriboank <br /> Subject Rear 3525155tack<o2401 w. San lose St Avocinani worn wan furnace Recul <br /> Arl <br /> I have discussed your request with management and we cancer with an extension to B April 2022 and fare <br /> proposal to submit a work plan for additional assessment of the sail vapor plume instead of a plan for <br /> additional remediauon. hot me know if you have any questions. <br /> Thanks, <br /> Bill <br /> William Branain, PE <br /> ResourceWater Control Engineer <br /> Private s Cleanup unit <br /> Central Valley Water Board <br /> Froom Lehman, Arcane anear<adis.mm> <br /> Scom itoat , seiAPIA <br /> ldellweae� n � liR thwateraaard:to Break <br /> Mal Michael<mmaalo orwhevron.rmn> <br /> Subject. 352535 Stockton 405 N. San lose St_Assessm of work Plain fnenslon Request <br /> EXTERML: <br /> Good Apparel Bill, <br /> As discussed on Features 30� Accepts is preparing an Assessment Work Plan in place of me Remedial Action Plan.The <br /> nechl purpose <br /> rvfore Prpo. arn {sretoeffoti. yPo, Ireapronc �nsm � � fbeomgaoasodrs adearvaoceon aa orreoderical notation there. <br /> a due �Apma Plan due to the c g planned when and <br /> to proviial Action Week Plan was initially due on February 25, 2022. Arcades It <br /> de uffidert bee tocomplere professional and client rMews. <br /> Neese much out if you have any questions or concerns. <br /> Andorra Pined Gemi <br />