My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOSE
>
401
>
2900 - Site Mitigation Program
>
PR0541148
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 11:04:50 AM
Creation date
2/24/2026 10:46:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541148
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0023563
FACILITY_NAME
DELTA MARINE SALES AND SERVICES
STREET_NUMBER
401
Direction
N
STREET_NAME
SAN JOSE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13526016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
401 N SAN JOSE ST STOCKTON 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron EnvlrmnmentalManagement Company - 2 - 6Apd12022 <br /> adjust the flm rate during the pump test to attempt to draw the groundwater fable down <br /> to 15 to 20 feel bgs and will monitor the groundwater elevation at MW-T with a water <br /> level meter. Groundwater elevagon will also be monitored during the Wrap test at MW-2 <br /> and the temporary boring location for SV-15, If available. Arcadis will store Me <br /> extracted groundwater temporarily on site in an intermediate bulk container and <br /> secondary spill containment system pending waste charectenzatmn. <br /> Arcadia will prepare a report fallowing receipt of Me laboratory analytical data to <br /> document the results of the assessment work and the pump test The report should <br /> include the following: soil boringlsoil vapor probe locations; documentation of sampling <br /> and soil vapor probe installation activities performed; results of the laboratory analyses; <br /> updated geologic cross sections; and conclusions and recommendations relevant to the <br /> assessment and remedial objectives. <br /> Central Valley Water Boats staff cancers with the work proposed in the Work Plan. <br /> Therefore, please submit the proposed report by 15 August 2022. <br /> Feel free W contact me with any questions or noncoms regarding this letter at <br /> (916) 4 4622 or Hill BralUin@waterboaMs ca <br /> qo Wiliam Brahmin, P.E. � <br /> Water Resource Control Engineer <br /> Private Sites Cleanup Unit <br /> Kristi Shelton. P.E. n.ma <br /> Senior Water Resource Control Engineer <br /> Private Sites Cleanup Unit 0:,,.e✓ <br /> cc. Michael Mailloux, Chevron Environmental Management Company, San Ramon <br /> Auddna Lehman, Aicadu U.S., Inc., Consent <br />
The URL can be used to link to this page
Your browser does not support the video tag.