Laserfiche WebLink
Pf ilClfiC rB.S 8Nf Pacific Gas and Electric Company <br /> act Metric, adPGEPIanRevierv@pgc,com <br /> Company Land Managcnront <br /> 300 Lakeside Drive <br /> Onklmtd,CA 94612 <br /> March 23,2026 <br /> Re:PA-2600014(C) <br /> Dear San Joaquin County Planning, <br /> Thank you for providing PG&E the opportunity to review your proposed plans For PA-2600014 <br /> (C). Our review indicates the proposed work and/or improvements appear to interfere with <br /> PG&E's existing facilities and land rights. <br /> PG&E has existing electric transmission lower lines in the vicinity of this project location as <br /> identified on the plans provided. No buildings or other structures will be permitted within the <br /> easement area. Cuts,trenches or excavations may not be made within 25 feet of PG&E towers. '.. <br /> PG&E engineers must review grade changes in the vicinity of our towers. No fills will be <br /> allowed which would impair ground-to-conductor clearances. Walls, fences, and other structures <br /> must be installed at locations that do not affect the safe operation of PG&'s facilities. Heavy <br /> equipment access to our facilities mast be maintained at all times.No wall, fence or other like <br /> structure is to be installed within 10 feet of tower footings. Since construction activity is <br /> proposed to take place near PG&E's overhead electric lines, please be advised it is the <br /> contractor's responsibility to be aware of,and observe the minimum clearances fa'both workers <br /> and equipment operating near high voltage electric lines. <br /> To request delineation maps for review of PG&E's existing facilities, please submit to the <br /> following mailbox for gas maps: Del ineatioiiMapRNtiests nge.conn. For electric maps,submit <br /> through PG&E's JUMP Portal: Joint Use Map Portal. Please note,when a request is submitted, <br /> the Delineation Team will confirm if a Nondisclosure Agreement needs to be completed. <br /> For any requests to modify or relocate PG&E's existing facilities,or to request gas and/or <br /> electric service,please submit an application to PG&E's Service Planning department through <br /> PG&E's Your Project Portal: Sign n In (yomyroiects-uee.com). <br /> As a reminder, before any digging or excavation occurs, please contact Underground Service <br /> Alert(USA) by dialing 811 a minimum of two (2)working days prior to commencing any wo4c. <br /> This free and independent service will ensure that all existing underground utilities are identified <br /> and marked on-site. <br /> If you have any questions regarding this response, please contact me at <br /> Matthieu.MeNath@pge.com <br /> Sincerely, <br /> Mathieu McNair <br /> Land Management <br />