My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3081
>
2900 - Site Mitigation Program
>
PR0541231
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 9:53:04 AM
Creation date
2/27/2026 9:19:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541231
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0023619
FACILITY_NAME
FORMER QUALITY CLEANERS TRACY CORNERS SHOPPING CENTER
STREET_NUMBER
3081
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418041
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3081 N TRACY BLVD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
549
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 SCHEDULE, REPORTING, AND ANTICIPATED ACTIVITIES 7.0 SIGNATURES OF PARTICIPATING PROFESSIONALS <br /> partner is prepared to initiate activities in this Workplan once the appropriate approvals and permits have Thank you for the opportunity to be of service. If you have any questions regarding this Workplan,please <br /> been obtained. We anticipate it will take four to six weeks to obtain the permits and to schedule field contact Debbie Soukup at(661)316-8237. <br /> activities. The soil gas samples will also be collected and analyzed during this same period. Sincerely, <br /> Partnerwill submit a draft Additional Soil Vapor Investigation Report to the DTSC approximately fourweeks �� <br /> after receipt ofthe laboratory analytical results <br /> .� As discussed during our October 91° meeting, anticipated Site actvities include installation of two cone <br /> penetrometer borings and subsequent collection of groundwater samples from the second groundwater Daniel Monteverde Deborah Soukup,Ph.D <br /> bearing zone beneaththe5ite.A separate Workplan for these activities will besubmitted to DTSCfor review Project Scientist-Site Mitigation Senior Project Manager-Site Mitigation <br /> and approval. <br /> + _ <br /> a <br /> °yOa <br /> Suri Rosen PG 7622,CHg 1075 Robert Traylor,PG 5877,CHg 5820 <br /> Technical Director-Site Mitigation Principal and Technical Director—Site Mitigaton <br /> T. <br /> Workplan forAdditional Soil Vapor Investigation PARTNER Workplan for Additional Soil Vapor In estigationme Ce PARTNER <br /> Tracy Corners Shopping Center Tracy Comers Shopping nter <br /> 3225 North Tracy Boulevard 3225 North T.,Boulevard <br /> Tracy,California 95376 Tracy,California 95376 <br /> February7,2020 February 7,2020 <br /> Page 10 Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.