Laserfiche WebLink
Additionally, in 2020, Partner installed two offsite soil vapor probes (SG-40 and SG-41) south of the Site on <br /> the north side of Scarlett Place. Two rounds of sampling were completed after installation, one in December <br /> 2020 the other in June of 2021. Results from the first round of sampling in December 2020, were above the <br /> PCE RWQCB Residential ESL of 15 pg/m3, whereas results from the second round completed in June 2021 <br /> were slightly above or below the PCE RWQCB Residential ESL (SG-40 was 13 pg/m3 and SG-41 was <br /> 16 pg/m3). Results are summarized on Table 1. <br /> As directed in DTSC's August 31, 2022 memorandum, additional soil gas sampling will be performed along <br /> the western and southern property borders and at the residences located west and south of the Site. <br /> Additionally, the proposed indoor/outdoor sampling at the former dry cleaner building will be expanded to <br /> include the supermarket building, and temporary wells will be installed to evaluate the vertical distribution of <br /> COPCs in groundwater. The proposed scope of work to complete the sampling is provided in Section 3. <br /> There have been numerous investigations and remedial actions completed at the Site, details for which can <br /> be found in the following reports: <br /> 1. Phase I Environmental Site Assessment(Partner, 2014) <br /> 2. Phase II Subsurface Investigation Report (Partner, 2014) <br /> 3. Additional Subsurface Investigation Report (Partner, 2015) <br /> 4. Expedited Site Characterization (Partner, 2015) <br /> 5. Regulatory Agency Records Review (Partner, 2015) <br /> 6. Site Characterization Report (Partner, 2017) <br /> 7. Additional Site Characterization Report (Partner, 2017) <br /> 8. Second Quarter 2017 Groundwater Monitoring Report (Partner, 2017) <br /> 9. Third Quarter 2017 Groundwater Monitoring Report (Partner, 2017) <br /> 10. SVE Pilot Test Report(Partner, 2017) <br /> 11. Baseline Health Risk Assessment and Site-Specific Cleanup Goals Report (Partner, 2018) <br /> 12. Memorandum for Expansion of the SVE System for Additional Testing (Partner, 2018) <br /> 13. Addendum to the Memorandum for Expansion of the SVE System for Additional Testing <br /> (Partner, 2018) <br /> 14. Second Addendum to the Memorandum for Expansion of the SVE System for Additional Testing <br /> (Partner, 2018) <br /> 15. Indoor Air Quality Sampling Report(Partner, 2018) <br /> 16. Status Update for Expanded SVE System and Additional Pilot Testing (Partner, 2019) <br /> 17. Rebound Soil Gas Sampling Results and Site-Specific Attenuation Factor Analysis (Partner, 2020) <br /> 18. Off-Site Scarlett Place Soil Gas Sampling Results (Partner, 2021) <br /> 2.3 Other Site Information <br /> 2.3.1 Site Hydrogeology <br /> Based on previous investigations, shallow groundwater has typically been encountered at approximately 8 to <br /> 10 bgs. During the most recent groundwater monitoring event performed on September 14, 2017, the <br /> predominant localized groundwater hydraulic gradient was relatively flat (0.003 to 0.005 feet per foot [ft/ft]) <br /> 3989.0001S101/R Revised Data Gap Investigation Work Plan I ROUX 14 <br />