My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3081
>
2900 - Site Mitigation Program
>
PR0541231
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 9:53:04 AM
Creation date
2/27/2026 9:19:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541231
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0023619
FACILITY_NAME
FORMER QUALITY CLEANERS TRACY CORNERS SHOPPING CENTER
STREET_NUMBER
3081
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418041
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3081 N TRACY BLVD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
549
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Emergency Response Plan <br /> This emergency response plan details actions to be taken in the event of Site emergencies. The PM and <br /> SHSO are responsible for the implementation of emergency response procedures on-Site. The SHSO/PM <br /> provides specific direction for emergency action based upon information available regarding the incident and <br /> response capabilities and initiates emergency procedures and notification of appropriate authorities. In the <br /> event of an emergency, Site personnel are evacuated and do not participate in emergency response <br /> activities, response is facilitated through external emergency services. <br /> 6.1 Emergency Response <br /> The SHSO, after investigating the incident and relevant information, shall determine the level of response <br /> required for containment, rescue and medical care. Limited on-Site emergency response activities could <br /> occur; therefore, the SHSO is responsible for notifying external emergency response agencies during and/or <br /> after such activities have taken place. The SHSO provides relevant information to the responding <br /> organizations, including but not limited to the hazards associated with the emergency incident, potential <br /> containment problems, and missing Site personnel. <br /> 6.2 Emergency Alerting and Evacuation <br /> If evacuation notice is given, Site workers leave the worksite, if possible, by way of the nearest exit. <br /> Appropriate primary and alternate evacuation routes and assembly areas have been identified and are shown <br /> on the Site Plan with Emergency Muster Area (Figure 2). The routes and assembly area will be determined <br /> by conditions at the time of the evacuation including but not limited to, wind direction, the location of the <br /> hazard source, and other factors as determined by SHSO/PM. <br /> Personnel exiting the Site gather at a designated assembly point. To determine that everyone has <br /> successfully exited the Site, personnel will be accounted for at the assembly point. If any worker cannot be <br /> accounted for, notification is given to the SHSO, PM, and any arriving response authorities so that appropriate <br /> action can be initiated. Subcontractors on this Site have coordinated their emergency response plans to <br /> ensure that these plans are compatible with these procedures, that potential emergencies are recognized, <br /> communication systems are clearly understood, and that evacuation routes are accessible to all personnel <br /> relying upon them. <br /> 6.3 Emergency Medical Treatment and First Aid <br /> In the event of a work-related injury or illness, employees are required to follow the procedures outlined <br /> below. All work-place injury and illness situations require Roux's Project and Corporate Management Team <br /> to be notified when an injury or illness incident occurs, and communication with the contracted Occupational <br /> Health Care Management Provider, WorkCare, Inc. (formally AllOne Health) , must also be initiated as <br /> necessary. The Injury/Illness Notification Flowchart is provided below and within Roux's Incident <br /> Investigation and Reporting program included within Roux's Corporate Health and Safety Manual. <br /> employeeInvolved • <br /> the OHSM/PM verbally <br /> • OM verbally <br /> OM immediately notifies the CHSD verbally <br /> 3989.0001 S.104/HSP Site-Specific Health and Safety Plan I ROUX 117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.