My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3081
>
2900 - Site Mitigation Program
>
PR0541231
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 9:53:04 AM
Creation date
2/27/2026 9:19:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541231
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0023619
FACILITY_NAME
FORMER QUALITY CLEANERS TRACY CORNERS SHOPPING CENTER
STREET_NUMBER
3081
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418041
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3081 N TRACY BLVD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
549
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Whenever changes in work practices must be implemented; and <br /> • When new conditions are identified and/or information becomes available. <br /> Daily safety briefings shall be recorded on the Roux Daily Tailgate Health and Safety Meeting Log/Daily Site <br /> Safety Checklist, and all completed forms will become a part of the project file. <br /> 8.8 Spill Containment <br /> Spill containment equipment and procedures should, at a minimum, meet the requirements of the facility's <br /> Spill Prevention, Control and Countermeasure Plan (SPCC), if applicable. Otherwise, spill containment <br /> equipment and procedures must be considered depending on the task including, but no limited to, <br /> chemical/product transfer points and handling, and storage. <br /> 8.8.1 Initial Spill Notification and Response <br /> Any worker who discovers a hazardous substance spill will immediately notify the SHSO. The worker will, to <br /> his/her best ability, report the hazardous substance involved, the location of the spill, the estimated quantity <br /> of material spilled, the direction/flow of the spill material, related fire/explosion incidents, and any associated <br /> injuries without compromising their own safety. <br /> 8.8.2 Spill Evaluation and Response <br /> The SHSO is responsible for evaluating spills and determining the appropriate response. When this <br /> evaluation is being made, the spill area will be isolated and demarcated to the extent possible. If necessary <br /> to protect nearby community members, notification of the appropriate authorities is made by the PM as <br /> appropriate. On-Site response is limited to small spills (e.g., <10 gallons); large spills require external <br /> emergency responders who will be contacted by the SHSO. <br /> 8.9 Decontamination <br /> The decontamination section of the HASP describes how personnel and equipment are decontaminated <br /> when they leave the EZ. This section also describes how residual waste from decontamination processes is <br /> disposed of. The Site decontamination procedures are designed to achieve an orderly, controlled removal <br /> or neutralization of contaminants that may accumulate on personnel or equipment. These procedures <br /> minimize worker contact with contaminants and protect against the transfer of contaminants to clean areas <br /> of the Site and off-Site. They also extend the useful life of PPE by reducing the amount of time that <br /> contaminants contact and can permeate PPE surfaces. Decontamination is facilitated within the CRZ at this <br /> Site, if applicable. <br /> 8.9.1 Decontamination Procedures for Personnel and PPE <br /> The following are general decontamination procedures established and implemented at this Site: <br /> 1. Decontamination is required for all workers exiting a contaminated area. Personnel may re-enter the <br /> SZ only after undergoing the decontamination procedures described in the next section. <br /> 2. Protective clothing is decontaminated, cleaned, laundered, maintained and/or replaced as needed <br /> to ensure its effectiveness. <br /> 3. PPE used at this Site that requires maintenance or parts replacement is decontaminated prior to <br /> repairs, or <br /> 3989.0001 S.104/HSP Site-Specific Health and Safety Plan I ROUX 132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.