Laserfiche WebLink
Subsurface Utility Clearance <br /> Management Program 2.9 <br /> • If a utility cannot be found as marked Roux personnel shall notify the facility owner/operator directly <br /> or through the one call center. Following notification,the excavation may continue, unless otherwise <br /> specified in state law. <br /> • Contractors/subcontractors must contact the one-call center to refresh the ticket when the <br /> excavation continues past the life of the ticket. Ticket life shall be dictated by state law however at <br /> a maximum ticket life shall not exceed 20 working days. <br /> 3.3 Stop Work Authority <br /> Each Roux employee has Stop Work Authority which he or she will execute upon determination of any <br /> imminent safety hazard, emergency situation, or other potentially dangerous situation, such as hazardous <br /> weather conditions. This Stop Work Authority includes subsurface clearance issues such as the adequacy <br /> of a mark-out or identification during intrusive operations of an unexpected underground <br /> utility. Authorization to proceed with work will be issued by the PM/PP after such action is reviewed and <br /> resolved. The PM will initiate and execute all management notifications and contact with emergency <br /> facilities and personnel when this action is appropriate. <br /> 1/2019 Corporate Health and Safety Management Program I ROUX 13 <br />