Laserfiche WebLink
Subsurface Utility Clearance <br /> Management Program 2.9 <br /> digging around the perimeter). In these cases, dig in small lifts (<12" for first five feet) using a <br /> dedicated spotter.) For Tolerance Zone work, unless otherwise agreed upon with the Utility <br /> Operator, work within the tolerance zone requires verification by means of hand-dug test holes to <br /> expose the utility. Once structures have been verified a minimum clearance of two feet must be <br /> maintained between the utility and any powered equipment. <br /> 1/2019 Corporate Health and Safety Management Program I ROUX 12 <br />