Laserfiche WebLink
TABLE OF CONTENTS 1.0 INTRODUCTION <br /> 1.0 INTRODUCTION......_____. ............�1 Partner Engineering and Science, Inc(Partner),on behalf of Stuart Limited Partnership(SUP),is pleased to <br /> ....�..........��....................�-u submit this Workplan for Soil Vapor list (Workplan) Tracy Corners Shopping 1.1 Objective........................................................................................................_. ...................._1 �P P° Sampling *P <Y Lerner located at <br /> 3225 North Tracy Boulevard,Tracy,1.2 Limitations.........................................................................................................__........................._1 cY q,in San Joaquin County,California (hereafter referred to as'the Site'). <br /> 2.0 SITE DESCRIPTION AND HISTORY_.... _..................... .....______2 This Workplan was prepared in response to the requirements for additional Site chamoteriaation and soil <br /> 2.1 Site Description........................................................................ ..........................2 vapor sampling specified in the California Department of Toxic Substances Control(DTSC) December 31", <br /> 22 ProjectHistory................_.........................................................._............... ..............................2 2019 letter from Ms.Cindy Chain-Britton to Mr.Stuart Sobek <br /> 3.0 GEOLOGY AND HYDROGEOLOGY.......-_......._..............__......_..............__3 <br /> 4.0 FIELD ACf1VMES._............_._......................__.......................................... -S 1.1 Objective <br /> 4.1 Drilling Permits._...........................................__.._....................................................._........................._.5 <br /> 4.2 Health and Safety Plan............................................................................................................................5 This Workplan describes the installation and sampling of additional soil vapor monitoring points on Site <br /> 4.3 Utility Cleamnce..........................................._......................................-...................................................5 and south of the Site on Sadett Place. Procedures for replacement of existing,damaged soil vapor probes <br /> 4.4 Soil Gas Probe Installation................................................................................................................._.5 and replacement of probes with no flow conditions are also discussed in this Workplan.Additionally,the <br /> 4.4.1 Soil Gas Probe Locations.....................................................................................................5 scope of work presented herein was discussed with DTSC staff during a meeting on October 9,2019. <br /> 4A.2 Drilling Equipment................................................................................................................5 <br /> 4.4.3 Decontamination....................................................................................................................6 The proposed activities described herein will be performed in accordance with the Quality <br /> 4.4.4 Sampling Depths...............-...................................................................................................6 Assurance/Quality Control Plan(QA/QC Plan;Appendix A),Sampling and Analysis Plan(SAP;Appendix 3), <br /> 4A.5 Soil Sampling Methodology........................................................_.................................._.6 and Site Health and Safety Plan (HASP;Appendix Cj previously submitted to the DTSC as part of the <br /> 4.4.6 Soil Gas Probe Construction..............................................................................................6 Sampling and Analysis Workplan - Tary Comers Shopping Center (dated August 15, 2016. These <br /> 4.5 Investigation-Derived Waste................................................................................................................7 documents were approved by the DTSC in a letter to Mr.Stuart Sobek dated August 21,2016. <br /> 5.0 SOIL GAS SAMPLING.................................................._..............._....................._8 <br /> 5.1 Soil Gas Sampling Methodology.._...................................................................._._...................8 <br /> 5.2 Regulatory Agency Guidance........................_. ..............9 12 Limitations <br /> 6.0 SCHEDULE,REPORTING,AND ANTICIPATED ACTIVITIES............. ........10 This Workplan fog Additional Soil Vapor Investigation was prepared by Partner under the professional <br /> 7.0 SIGNATURES OF PARTICIPATING PROFESSIONALS._............ ____....11 direction and review ofthe registered professional(s)listed in Section 7.0 ofthis document Specified work <br /> was performed in accordance with generally accepted practices in environmental engineering and science, <br /> Rgures 1. Site Plan engineering geology,and hydrogeology. No other warranty,either expressed or implied,is made. <br /> 2. Topographic Map The recommendations and/or conclusions provided in this Workplan are based on obsenations, the <br /> 3A. Sail Vapor Probe and SVE Well Locations goveming regulations,and/or available information from regulatory agencies,previous field investigations; <br /> 311. Soil Vapor Probe and SVE Well Locations-Former Dry cleaners Vicinity and/or the results of laboratory analysis of soil,soil gas,and/or groundwater samples. Recommendations <br /> 4. Proposed Soil Vapor Probe Locations-Sarlett Place and/or conclusions beyond those stated and reported herein should not be inferred from this document <br /> S. Soil Gas Probe Construction Reports,both verbal and written,as they pertain to the Tary Corners Shopping Center are for the sole use <br /> and benefit of Stuart Limited Partnership,LLC,and/or DTSC. This report has no other purpose and may not <br /> be relied upon by another person or entity without the written consent of Partner. <br /> Workplan for Additional l Sol Vap <br /> or lree tigadon <br /> Tracy Comers Center PARTNER 35Norh Tracy Boulevard <br /> Tay, 95376 <br /> Februan,7,2020 Page 1 <br />