My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TENTH
>
65
>
2900 - Site Mitigation Program
>
PR0544562
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2026 10:21:34 AM
Creation date
2/27/2026 10:20:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544562
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0025330
FACILITY_NAME
BORDEN TRUST PROPERTY
STREET_NUMBER
65
Direction
E
STREET_NAME
TENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
65 E TENTH ST TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 June 2019 Advanced, <br /> AGE Project No. 19-4705 E n v i ro n m e n t o I <br /> Page 6 of 6 <br /> The soil-vapor samples will be transported under chain-of-custody procedures to a <br /> CELAP-certified laboratory and analyzed for VOCs and IPA (tracer gas) in accordance <br /> with EPA Method TO-15. <br /> After collection of the sample, soil-vapor from the polyethylene tubing will be monitored <br /> for the presence of volatile organics using an organic vapor meter equipped with a PID. <br /> 3.4. EQUIPMENT DECONTAMINATION <br /> All non-disposable sampling equipment will be triple-rinsed in a solution of Alconox prior <br /> to advancement of each boring. Rinseate generated during drilling activities will be <br /> containerized in properly labeled Department of Transportation (DOT)-approved 55- <br /> gallon drums and stored on-site in an area lacking public access. Disposal alternatives <br /> will be evaluated at a later date based on laboratory results. <br /> 3.5. BORING ABANDONMENTS <br /> Following borehole advancements, Portland cement (grout mix) will be utilized to <br /> backfill each borehole utilizing a tremie pipe. The SJCEHD will be given the opportunity <br /> to inspect the grout mix prior to backfilling activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.