My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TENTH
>
65
>
2900 - Site Mitigation Program
>
PR0544562
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2026 10:21:34 AM
Creation date
2/27/2026 10:20:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544562
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0025330
FACILITY_NAME
BORDEN TRUST PROPERTY
STREET_NUMBER
65
Direction
E
STREET_NAME
TENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
65 E TENTH ST TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Limited Phase II Site Assessment Work Plan <br /> BORDEN TRUST PROPERTY <br /> 65&67 East 10th Street,Tracy,California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION...................................................................................................1 <br /> 2.0. BACKGROUND.....................................................................................................1 <br /> 3.0. SCOPE OF WORK................................................................................................1 <br /> 2.1. PRE-FIELD WORK ACTIVITIES........................................................................2 <br /> 2.2. SOIL PROBE BORINGS AND SAMPLING........................................................2 <br /> 2.3. SOIL-VAPOR SAMPLING&ANALYSIS............................................................3 <br /> 2.4. REPORT PREPARATION..................................................................................3 <br /> 3.0. FIELD PROCEDURES..........................................................................................3 <br /> 3.1. SOIL BORING ADVANCEMENT AND SOIL SAMPLING...................................3 <br /> 3.2. GRAB GROUNDWATER SAMPLING................................................................4 <br /> 3.3. SOIL-VAPOR SAMPLING&ANALYSIS............................................................4 <br /> 3.4. EQUIPMENT DECONTAMINATION..................................................................6 <br /> 3.5. BORING ABANDONMENTS..............................................................................6 <br /> FIGURES <br /> Figure 1 —Location Map <br /> Figure 2—Site Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.