My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SWANSON
>
0
>
2900 - Site Mitigation Program
>
PR0544600
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2026 11:09:10 AM
Creation date
2/27/2026 11:08:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544600
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0025349
FACILITY_NAME
NORTH MANTECA TRUNK SEWER PROJECT
STREET_NUMBER
0
STREET_NAME
SWANSON
STREET_TYPE
RD
City
MANTECA
Zip
95337
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
0 SWANSON RD MANTECA 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan and Health and Safety Plan BSK Project No. G1910411L <br /> North Manteca Trunk Sewer Test Well June 17, 2019 <br /> Manteca, California Page 2 <br /> SCOPE OF SERVICES <br /> I <br /> Task 1— Field Coordination and Permitting <br /> This task will include locating the test well borehole in the field, utility clearance, and permitting. BSK <br /> will visit the project site to locate and mark the test well borehole location,and contact USA North 811 a <br /> minimum of 72 hours prior to our subsurface exploration for utility clearance. A private utility locator <br /> will also be scheduled to clear the test well location. <br /> As required by local ordinance, a drilling/well installation permit will be obtained from San Joaquin <br /> County (County) prior to our field investigation. An encroachment permit will not be required since the <br /> test well will be located within City of Manteca Right-of-Way. <br /> Task 2 —Subsurface Investigation <br /> The subsurface investigation will consist of the pumping of groundwater from the test well at different <br /> rates and measurement of the water level at intervals of time during pumping, and after pumping has <br /> ceased, to characterize the capacity of water-bearing sediments to yield water over time <br /> (transmissivity), and the amount of drawdown within the well at different pumping rates. Th pur os <br /> of this investigation is to better understand the level of effort require to dewater open excavations <br /> during installation of sanitary sewer piping and facilities during construction of the North Manteca Trunk <br /> Sewer. <br /> BSK will retain a California C-57 licensed water well driller to install the test well. We propose to install <br /> at 4-inch internal diameter (ID) test well to a depth of 35 feet, with 0.020-inch width screen slotting <br /> from 15 bgs to 35 feet bgs and solid casing from 15 feet bgs to the ground surface; an additional 2 feet <br /> of well casing will comprise a riser above the ground surface to help prevent material from entering the <br /> well during testing.The annular space between the borehole walls and the well casing will be filled with <br /> clean, #212 grade sand from 35 feet bgs to two feet above the screen interval, at 13 feet bgs. A <br /> bentonite clay seal will be installed from 11 feet to 13 feet bgs, overlain by a neat-cement grout to the <br /> surface. The surface seal will be allowed to cure for 72 hours before the well is used. Soil cuttings <br /> generated from the boring will be disposed at an unimproved location adjacent to the borehole. <br /> The well boring observations will be recorded on a detailed boring log at 5-foot intervals from the <br /> ground surface to a depth 35 feet bgs to observe and classify subsurface sediments using the former <br /> American Society for Testing and Materials Method (ASTM), now "ASTM International', Standard <br /> D2488. <br /> Our evaluation of groundwater transmissivity within the range of the dewatering well will consist of a <br /> step-drawdown test conducted over a period of 12 to 18 hours, depending upon the stabilization of <br /> Bzl< <br />
The URL can be used to link to this page
Your browser does not support the video tag.