Laserfiche WebLink
Appendix A- Responses to Regulabory(somments <br /> Draft Waste Cluaracterocation Work Plan, Se MWSO5 ISHADr007A Wdl <br /> Sharpe Army Depot, Lathrop, California <br /> No. I Page I graph Comment Response <br /> Comments <br /> 1. Page I Section For clarM, revise section to The KAWS05 well cluster is the <br /> 1.2 briefly explain him the off-sine SHAVeC07 Is investigation <br /> area is associated with2 has been-0rked to clarify <br /> P0,007 and +AM. the site location and <br /> background. <br /> 2. Pages <br /> acid g Section <br /> concentrations have the pentential to and 2.0 has been <br /> Follows: `The addcal revised <br /> groundwater as <br /> 4 2.0 Ad mass to the y <br /> plumes beneath the area, rt <br /> hereby, significant increasing trend in <br /> lengthening cleanup times". This <br /> statement Is unclear. indicate there Is E <br /> re end revising it to state 'Yhe w mass that our rent aTsignificant increasing TZE trendm conceptual hyamgeologic <br /> well MWSOs model time o noaccount for, <br /> Indicate there is additional TU mass which may angthen cleanup <br /> that our current conceptual model Unnes., <br /> does got ccount for' or something <br /> Revise these sections to explain him <br /> ow me <br /> and <br /> 2.1 the Army determined the reared to clarify bow the <br /> 2.2 m ancestor sampling interval Hongmember milling interval <br /> should span from W to 140 fee was determined and to provide <br /> below ground surface Him) and how Information on how specific <br /> the Amy will select specific sampling depths within this <br /> ampling depths within this depth samplingInterval will be <br /> inteml. selected. <br /> JL Pap 6 Section wentay where the equipment hed <br /> .6 decamamination pad will be mmenMy the location of the <br /> looted.m The dew pad. <br /> Cris section refers to the site waste Site Waste Management <br /> .s Management Plan (AHTN 016) fir Plan (Many, 2016) has been <br /> handling of investigation demand! afforded to the refereni <br /> waste. Has his document been dartalauses. <br /> submitted to the project regulatory <br /> team? Hnor, please upload it to <br /> racker and Emimst 6. Pages Section �tolof the bullets In the section Section 3.2.7 has been revised <br /> .T provide examples of activities that to Include only activities <br /> are not planned undertibe Oran panned under the Wok Pan. <br /> - WARala�0.evise this section <br /> increa <br /> Pagearif6 <br />