Laserfiche WebLink
Amy Reset WWAAr evnn <br /> 3.0 Waste Characterization Activities <br /> All tasks will be conducted in a manner that pmteds the safety and health a employees and members of <br /> the public, and that complies with Occupational Safety and Health Arm mis ninn and JMOE Health and <br /> Requirements,Safety as described in the AccidentPreventhen Alan (AP ; AMna,20160.Ahmawill conduct <br /> all activities ln full compliance with Department of Defense, Army, USACE, state, landowner, local and <br /> federal requirements regarding safety, personnel, equipment, and procedures. A description of planned <br /> fieldwork, Including procedures, rationale, equipment, and proposed methods, is provided below. <br /> 3.1 Pre-Characterization Field Activities <br /> Pre on field activities will consist of coordination with USAGE, foal businesses, permitting, <br /> and geophysical and biological clearances, as needed. <br /> 3.1.1 Notification and Access <br /> Prior to commencing field activities, SHAD-W] Is 009 site access (Right of Entry Agreements) Vill be <br /> marinaded with USACE and local businesses. If required, pre-charactelrbatlon field aRNltles Including <br /> biological clearance (i.e., burrowing owl monitoring) will be coordinated with the Cry of Lehrer and the <br /> Glifornla Department of Fish and Wildlife. <br /> 3.1.2 permitting <br /> activities,Prior to dinfling fired drilling permits For borings will be obtained from San Joaquin <br /> y <br /> Co Environmental Health Department. <br /> 3.1.3 Geophysical Clearance <br /> Undemmund utilities and other obstructions that can be encountered will be identified by performing a <br /> utnity clearance at each proposed boring and well location before drilling activities commence. Clearance <br /> includeadivities Lion us utility and utility promotionorgan appropriate in <br /> addition to performing caste surveys using the geophysical equipment. Incatmrs of unities will be <br /> mar" on the ground surface indications of the as med type of utility. Prior ting intrusive <br /> utility location information will be reviewegi eluding field markings and available drawings. <br /> activities, rm <br /> Bon r gs will be hand careered (or similar method) to adepth of 5 ft bgs. <br /> 3.1.0 Burrowing Owl Manrgemem - <br /> Pirate conducting anyfield operations, the procedures outlined In the Burrowing Owl Mprmgement plan, <br /> $home Deput(Albion Environmental, 199])will be bellowed and information from the most recent annual <br /> bur Out census <br /> rwed. This will allow berm <br /> not a" Potential adverse effect <br /> that the fieldwork may have on any owls residing within the Investigation areas. <br /> 3.1.5 Traffic Gratrel Plan <br /> Tract will be controlled in accordance with the Traffic Control Plan Induced in the APP (Ahura, 2016c) <br /> and may include the use of barricades, traffic cones, and fending, as necessary. No road closures are <br /> anticipated, as all work locationsplanned to be in openmass. The impact traffic flow anticipated <br /> to be minimal or non-ealatenasDop proposed work locations are all in ligMsls areas; however, if warranted <br /> by workspace needs and traffic patterns, additional lens and traffic control personnel will be used. <br />