Laserfiche WebLink
I , <br /> 6wne Army pare; tammA Givarsho <br /> it <br /> 4.0 Soil Excavation and Offsite Disposal Activities <br /> '( All Wks will be conducted in a manner the protects the safety and health of employees and members of <br /> the public, and that compiles with Occupational Safety and Health Administration and USAGE Health am <br /> Safety Requirements, as desribel in the AcefentPrevention Flow(APP;Ahta, 2016c). AM1tna will conduct <br /> all activities in full compliance with Department of Defense, Army, USACE, state, landowner, locel and <br /> formal requirements regarding safety, personnel, equipment, and procedures. A description of planned <br /> fieldwork, including procedures, rationale, equipment, and proposed methods, in provided below. <br /> 0.1 Pre-Excavation Field Activities <br /> Prerexcurearalion field activities will c of coordination and Pr n dio of Monterey <br /> ( , Environmental Division (DPW-E),upermatl gr and geophysical and biological <br /> daanreaeaz needed. om <br /> 'I 0.1.1 Notification and Access <br /> Fiber to commercial fieldw stallatl andoblamint <br /> stallation utility maps will belecoordinateduwith thenArmynand Preside ofnM nterey OPW-E. Pre- <br /> eon field enables, including biologial clearance (i.e., burrowing owl monitoring), will be <br /> coordinated with the Presidio of Monterey DPw-E and the California Department of Fish and wildlife. <br /> 4.1.2 Permit4ng <br /> The site area is lung than 5 acres and less than 2,500 cubic yards per day will be removed tram the site. <br /> I Additionally, no excavation actMtia me xca will be performed off site. Therefore, no excavation, air perms or <br /> dust control plans orpermits are required per San Joaquin Air Pollution Control Direct Rule 8021 <br /> However, bndonment/datruction permits will be obtained farm the San Joaquin <br /> Defendants of Environmental Health (det). <br /> The (None and WDEH representativers will be notified at least 48 boom Prior to commencementthe oftM1 <br /> field region allowtlme forfield inspections.At a dinbum, the represenlatives will be present to monitor <br /> well abandonment serene and backflll compaction activi la. <br /> Field activities will be conducted W minimize the release of airborne fandangos within and outside of <br /> the boamulares of the site. <br /> Oust and particulate will be controlled in accordance with the APP (Mona, <br /> 1&)b spread of contamination and to protect human health and the environment Visual <br /> air monitoring and dust commit will be conducted to veiny the effectiveness of the progam. A water truck <br /> will be used for dust ion. <br /> 4.1.3 Geophysical Clearance <br /> '. � Underground utilities and other obstructions that can be encountered will be identified by Performing <br /> Why clearance at the site before examination . Clearance a< Include <br /> notification gsu�species and utility Protection as ce appropriate, hauctio the perbrm eop yai al equipment ot utilities will bemarked o <br /> j ground surfaceswith lndl Mlonz of the assumed typeutility. P for to initiating intrusive activities, utility <br /> ' location information will he reviewed, Including field markings and available drawings. <br /> I . <br /> " I Atw madmmneom{ Ina. 6 <br />