Laserfiche WebLink
WaM Plan for the Oeoommosionina 0 LINL Site 30o Wada genet <br /> I . Prior to drilling, obtain any requlmd permlls or access agreements (e.g. County <br /> perrnits for well destruction and pmpertyowner access agreements). <br /> 2. Remove any installed pumps or piping from [be inside of the well rasing and <br /> document the condition ofthe well completion using video lugging. <br /> 3. Remove airy above-grotmd surface completions. stovepipes will be nnlwlled from <br /> concrete pads. Concrete pads will bo removed from the ground surface. <br /> 4. Document the depth-to-water, total depth of the wen, and the time and date or the <br /> well decommissioning (star and finish times). <br /> 1.1 Over Dolling: <br /> 1. Drill out Me casing using hollow than auger, into-sonic, mud rotary, or a <br /> combination of these aril ling methods, as determined by Me ERD hydrogmlo <br /> ggy <br /> team and the drilling contractor. 'I lie drill bit used for over drilling should he <br /> slightly larger in diameter than the original wen borehole to remove all of Me <br /> annular material. prior to drilling, the surface completion will be removed, it <br /> necessary, to allow access to the well casing. <br /> 2. to Me cancer f sible, ensure that the entire casing has been removed. Whennsing <br /> a drill bit, frequently check and document that pieces of casing are in the callings. <br /> Also, note any decrease in drill OR chairing which may indicate Mauhe bit has <br /> activated offthe casing. <br /> 3. Once the well and annular material have been completely removed, calculate the <br /> volume of neat cement gout acquired to fill the open borehole. <br /> 4. Neat cement grout should be composed of one bag (94 pounds) of Portland Cement <br /> to five to ten gallore Ofpatable water as detailed in the San Joaquin County Well <br /> Snmdards (San Joaquin County Ordfrunce Code Section 9-11156). <br /> 5. Place the neat cement grout W the bottom of Me borehole via tremie pipe. The <br /> boring should be filled until undiluted neat cement growl Meows lion the borehole at <br /> groomdsurface. the tremie pipe should be withdrawn gradually during this <br /> Process. <br /> 6. Verify that Me amount organ pumped is equal or greater than the calculated <br /> volume. <br /> J. While waiting for the grant to set, cover and barricade Me humbole to prevent <br /> introduction of fixeign material and to protect the public. After the Smut has set, <br /> the grouFfilled borehole will be over drilled to 3-5 feel below grade then back- <br /> filled with clean uncontaminated fill material to a tovel Mat is even with the <br /> adjacent ground. For off site wells, up to 3 R of backfill material is allowed by San <br /> Joaquin County Well Standards. For an site wells, LLNL requires 5 R of backfill <br /> to prevetV potential damage to equipment during potential future operations in Me <br /> red. Ifthe well location is in a paved or asphalt area Me well box will bo removed <br /> and the area below grade will he filled with clean aggregate and concrete, and the <br /> surface will be howeled smooth. If the well location es in an unpaved area, soil <br /> will be used as backfill following removal of the well box, if present. <br />