My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> • . Site • • <br /> 6.1 Site Work Zones <br /> Site layout and site control need to be coordinated to achieve a productive work environment and efficient work process while <br /> minimizing exposure of employees and the public to hazards associated with the work. Consider the following items when <br /> planning the site layout and controls. Check the description of the site controls already in place: <br /> ❑X Work area is within a facility/property with secure and restricted access provided by client or third party <br /> ❑ Work area is enclosed within a facility/property, but access is not restricted via locks, guards, or gates <br /> ❑ Work area is on a property that is open, but access by the public is unlikely <br /> ❑ Work area is on a property that is open and access by the public is likely <br /> ❑ Work area is in a roadway or right of way of a roadway(Traffic Control/Protection Plan required S3AM-306-PR1) <br /> ❑X Work area is in a parking lot or driveway <br /> ❑ Work area is on or near railroad, including right of way, active lines and crossings <br /> ❑ Other: n/a <br /> Consider the following items when planning the site layout and controls: <br /> ■ "Line of Fire" hazards-overhead utilities,falling/tipping equipment, release of energy/pressure,flying debris <br /> ■ Noise, dust,odor suppression <br /> ■ Contamination containment and decontamination area layout <br /> ■ Traffic control for site vehicles/equipment(public traffic control requires Traffic Control Plan) <br /> ■ Restricted access for areas requiring special training,skills, or certifications <br /> ■ Restriction of work near railroads <br /> ■ Presence or creation of excavations <br /> ■ Loading/unloading areas <br /> ■ Portable restrooms <br /> ■ Dumpsters and bins <br /> ■ Equipment lay down <br /> ■ Heavy equipment parking <br /> ■ Overnight safety and security needs <br /> Check and describe the site controls that need to be added to protect the public and the AECOM work team. <br /> Control Item I Description of Type and Application <br /> ❑ Fence n/a <br /> ❑ Locks n/a <br /> ❑ Barricades n/a <br /> ❑X Cones Cones will be used to signal and guide the traffic <br /> ❑X Tape Tape will be used to delineate the exclusion zone <br /> ❑ Hole Covers n/a <br /> ❑ Other: n/a <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) 18 <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />
The URL can be used to link to this page
Your browser does not support the video tag.