Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 6.3 Site Control Maps/Diagrams <br /> Contamination Reduction Zone(CRZ) Predominant <br /> p Wind Direction <br /> Exclusion Zone)EZ) <br /> i (can be maimamed visually) % <br /> -------------------------------------------------- <br /> 1 I <br /> I I <br /> r Intrusive Activities <br /> (excavation,trench,etc) i <br /> Distances to be determined <br /> by the SSO <br /> Decontamination • <br /> Area <br /> CRZ <br /> Entry/Exh Control <br /> Point <br /> Support Zone)S ) <br /> 6.4 Newly Hired or Transferred Employees <br /> All newly hired or transferred employees with fewer than 6 months experience working on field projects or an employee who has <br /> not completed the required training or received required certifications are considered"Short Service Employees",or"SSEs" (see <br /> the Newly Hired or Transferred Employees procedure, S3AM-015-PR).The Project Manager will identify all SSEs working on <br /> the project, and each SSE will be assigned to an experienced team member so all activities may be monitored.All SSEs <br /> working or visiting a field environment are required to wear a green hard hat for safety and identification purposes. In the event a <br /> client has an existing SSEs program, AECOM will defer to the identification system required by the client. Any new employee <br /> shall wear the designated SSE identifier until the Project Manager determines the employee has the knowledge, skills, and <br /> ability related to the specific hazard on the project. <br /> The project scope of work does NOT currently involve SSEs. If it becomes necessary to use one or more SSEs to complete the <br /> project scope of work,then they will be evaluated and approved in advance by the AECOM Project Manager prior to mobilizing <br /> to site and listed in this HASP. <br /> 6.5 Lone Worker <br /> AECOM discourages employees from working alone(i.e., where AECOM personnel are out of visual and audio range of others) <br /> when performing field tasks(see Working Alone SHE Procedure S3AM-314-PR). If lone work is to be performed, a <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) 20 <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />