My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Health & Safety Plan FZ' <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> �7. Emergency Management <br /> 7.1.1 Emergency Response Plan <br /> A Project Emergency Response Plan must be developed by the AECOM Project Manager for its staff as per the project location <br /> like remote areas, industrial areas, city areas, etc. This plan and any alterations to this plan will be communicated to all AECOM <br /> project staff, subcontractors and visitors. Depending on the duration of the project, AECOM shall perform mock drills <br /> accordingly. <br /> Subcontractors will provide their own Project Emergency Plan to AECOM for review and acceptance. Any alterations to this plan <br /> must be communicated to all parties. Both AECOM and the subcontractor shall perform mock drills periodically in accordance <br /> with the length of the project. <br /> Refer to the AECOM Project Emergency Response Plan (Attachment 1). For additional information on Emergency Response <br /> Planning, please review the Emergency Response Planning procedure, S3AM-010-PR1. <br /> 7.1.2 Emergency Planning <br /> AECOM requires that all projects, plan for reasonably foreseeable emergencies. Prior to the start of site mobilization,all <br /> AECOM personnel shall review the site-specific information regarding evacuations, muster points, communication, and other <br /> site-specific emergency procedures. <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) 22 <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />
The URL can be used to link to this page
Your browser does not support the video tag.