My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final <br /> AECOM <br /> AECOM 2020 L Street <br /> Sacramento,CA 95811 <br /> aecom.com <br /> September 21, 2023 <br /> Our Reference <br /> 60688620-5.1, Bobson Cleaners Inc. <br /> Arielle McLeskey <br /> Site Mitigation and Brownfields Reuse Program <br /> California Department of Toxic Substances Control <br /> 8800 Cal Center Drive <br /> Sacramento, California 95826 <br /> Subject: Final Discovery Investigation Work Plan for Bobson Cleaners Inc. at 600 North Main Street, <br /> Manteca, California,95336 <br /> Dear Ms. McLeskey: <br /> AECOM is pleased to submit the enclosed Final Discovery Investigation Work Plan (Work Plan)for the above- <br /> referenced site.The Work Plan has been prepared for the Discovery Investigation portion of the Cleanup in <br /> Vulnerable Communities Initiative—Discovery and Enforcement(CVCI-D&E)Program.The Work Plan was prepared <br /> in accordance with the scope of work set forth in the California Department of Toxic Substances Control (DTSC) <br /> Contract Agreement Number(No.)22-T5019 and authorized by Work Order No. 2-22-T5019-WO2 dated December <br /> 19, 2022. <br /> This Work Plan was prepared by AECOM for DTSC in a manner consistent with the level of care and skill ordinarily <br /> exercised by professional engineers, geologists, and environmental scientists in the geographic area of the above- <br /> referenced site.AECOM provides no other warranties, either express or implied, concerning the contents of this Work <br /> Plan,which was prepared under the technical direction of the undersigned. <br /> Please feel free to contact Wanda L. Farmer at(843)209-1534 or Wanda.L.Farmer@aecom.com if you have any <br /> questions or comments. <br /> Yours sincerely, <br /> 9C .4- A. '4aA Y UJL <br /> Wanda L. Farmer <br /> Project Manager <br /> AECOM <br /> enclosure: Work Plan <br /> cc(with enclosure): (As requested by DTSC Project Manager) <br /> Arielle McLeskey <br /> Project Manager <br /> California Department of Toxic Substances Control <br /> Arielle.mcleskey(aDdtsc.ca.gov <br /> Prepared for: Department of Toxic Substances Control AECOM <br />
The URL can be used to link to this page
Your browser does not support the video tag.