My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task Hazard Assessment AECOM Imagineed <br /> DRILLING, GROUTING, MONITORING WELLS 01-01-03-07 <br /> Project Name: Client: Date: <br /> Permits Required? Work <br /> (list): Location: <br /> This THA must be fully reviewed with all staff members. All job steps, hazards, work practices, and PPE are clearly understood and <br /> have been implemented. All necessary revisions have been written on the THA. <br /> Required PPE: ® Hard Hat ®Safety Glasses ® HiVis Vest ®Safety Toe Boots ® Gloves: Leather, nitrile ® Hearing Protection ❑ Other: <br /> Tools&Equipment: Cutting tools, Hot Work Permit <br /> job/taskREMINDER: Use 4-Sight at the start of, and continuously throughout the <br /> Job Steps Potential Hazards Risk Critical Actions To Mitigate Hazards Risk <br /> List all steps required to perform How could you be hurt? (initial) List control measures required to eliminate, control or protect against the potential hazards (final) <br /> a task in the sequence they What would the injury be? associated with each job step to minimize the risk of <br /> are performed injury or environmental impact. Identify any`Stop Work'triggers. <br /> 1. Pre-mobilization, Equipment la.Injury from equipment 5 1a.Ensure that PM or person responsible for scheduling rental equipment requests that 4 <br /> Inspection. Contact One- malfunction the vendor inspects the equipment prior to site delivery to ensure all appliances are in <br /> Call, private utility contractor, 1 b.Failure to have underground working order and fit for use. <br /> and/or site personnel to utilities identified could result in 10 1 b.Call public utility locating service prior to initiating work activities. Use private locating <br /> locate and mark 4 <br /> explosion, electrocution, injury, service to mark out areas on private property. Verify location of utility marks;do not <br /> underground utilities. death, property damage. perform intrusive work if utility location marks cannot be found or if marks are <br /> destroyed. Preserve utility marks as much as possible. Call to have utilities remarked if <br /> unsure as to their location. Complete utility checklist form. <br /> On- <br /> Site <br /> Edits: <br /> 2. Setup Drill Rig and work 2a. Struck by vehicle or equipment g 2a. Verify that drilling contractor inspects equipment daily using S3AM-321-FM 1 Daily 4 <br /> zone traffic Drilling, Boring&Direct-Push Equipment Inspection or equivalent.Verify that kill switch <br /> on rig is tested and operational. Establish work zone using traffic control devices, signs, <br /> cones, etc. in advance of initiating monitoring well abandonment activities. Restrict <br /> access to observers and passersby. <br /> 2b. Sprain or broken bones due to g <br /> slip, trip in fall 2b. Maintain required housekeeping in work area, do not carry equipment where visibility 2 <br /> of ground is impaired, remove or mark all trip hazards in work area. <br /> 2c. Struck-by, crushed-by, caught- 10 2c. Communicate path of movement to all project personnel. Establish and use agreed 4 <br /> by drill rig. upon hand signals during spotting activities. Always use a spotter(s)to direct movement <br /> of drill rig and watch for vehicle and pedestrian traffic.Additional spotter(s)will be used in <br /> DCSA Task Hazard Assessment Form <br /> Version 1—October 22,2018 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.