Laserfiche WebLink
Task Hazard Assessment 'L=CoM °�Is�Qa. <br /> Environmental Soil Sampling - Hand Auger We Mei Fne F31 01-01-24-02 <br /> Project Name: Client: Date: <br /> Permits Required? I Work <br /> (list): Location: <br /> This THA must be fully reviewed with all staff members. All job steps, hazards, work practices, and PPE are clearly understood and <br /> have been implemented. All necessary revisions have been written on the THA. <br /> Required PPE: ® Hard Hat ®Safety Glasses ® HiVis Vest ®Safety Toe Boots ® Gloves: Leather, nitrile, ❑ Hearing Protection ❑ Other: <br /> CR <br /> Tools&Equipment: Hand auger w/extensions Sampling kit <br /> job/taskREMINDER: Use 4-Sight at the start of, and continuously throughout the additional <br /> Job Steps Potential Hazards Risk Critical Actions To Mitigate Hazards Risk <br /> List all steps required to perform How could you be hurt? (initial) List control measures required to eliminate, control or protect against the (final) <br /> a task in the sequence they What would the injury be? potential hazards associated with each job step to minimize the risk of <br /> are performed injury or environmental impact. Identify any`Stop Work'triggers. <br /> 1. Setup equipment 1 a.Cuts or hand injuries from 3 la.Inspect for broken welds on auger. If broken welds or cracks—STOP WORK.Wear 2 <br /> pinch points cut resistant gloves at all times and avoid handling the sharp edges of the auger cup. <br /> Keep face, hands,fingers, and feet out of the line of fire of moving parts and tools 2 <br /> 1 b.Back strain/overexertion when 4 1 b.Stretch before working. Bend and lift with legs and arms, not back. Team-lift any <br /> unloading equipment items that are awkward or over 50 pounds. If removing from the back of a truck, slide <br /> the case to the tailgate and lift from tailgate and not from the side of the truck bed <br /> On- <br /> Site <br /> Edits: <br /> 2. Advancing hand auger 2a. Contacting utilities causing 10 2a.Ensure subsurface clearance protocol is being followed before beginning work. Turn 4 <br /> serious personal injury or death. the auger slowly and if refusal is met, remove the auger from the borehole and <br /> inspect the cause of refusal. If a utility, pea gravel, or non-native fill material is <br /> encountered, STOP WORK and call the PM. <br /> 2b. Back strain or pulled muscle 6 2b.Do not yank on the auger handle. Do not turn at waist, turn with arms and shoulders, <br /> from rotating hand auger. keep feet square and lift with legs,do not work with arms above head. Take breaks 4 <br /> and rotate work. Use short extensions as you advance to avoid. <br /> 4 2c.Clear the work area of trip hazards. Walk around bore hole, never over it and cover 3 <br /> 2c. Injury from slip,trip,fall. hole with delineator when unattended. <br /> 2d. Injury to eyes from flying 3 2d.lf it is windy, stand upwind and switch to goggles to prevent dirt entering eye. 2 <br /> debris. <br /> DCSA Task Hazard Assessment Form <br /> Version 1—October 22,2018 1 of 4 <br />