Laserfiche WebLink
Task Hazard Assessment — DCSA 'L=COM °�lvered. <br /> Phase I ESA Site Visit 01-01-10-07 <br /> job/taskREMINDER: Use 4-Sight at the start of, and continuously throughout the additional <br /> Job Steps Potential Hazards Risk Critical Actions To Mitigate Hazards Risk <br /> List all steps required How could you be hurt? (initial) List control measures required to eliminate, control or protect against the potential hazards associated with (final) <br /> to perform a task in What would the injury be? each job step to minimize the risk of <br /> the sequence they are injury or environmental impact. Identify any`Stop Work'triggers. <br /> performed <br /> • Cold: Set up break schedule if temperatures are below 507. Breaks should be indoor or in <br /> vehicle to maintain warm temperatures. Consume required amounts of water and warm clinks <br /> (avoid caffeine). <br /> • Identify area of ice or deep snow(trip/slip hazards) <br /> • Scheduled site to be plowed before site walk <br /> • Don required outerwear based on temperatures(coat, hat, gloves, long pants, boots, etc. <br /> outermost layer must be hi-visible. Keep extra clothing. Remember PPE can increase/decrease <br /> body temperatures. <br /> On-Site <br /> Edits: <br /> ©AECOM Restricted <br /> Task Hazard Assessment(S4[DCS]AM-209-FM6-A) <br /> Revision 9 January 15,2019 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. 3 of 4 <br />