Laserfiche WebLink
AECOM Pre-Job Hazard Assessment - Soil Sampling <br /> Site Safety Orientation - Must be conducted by Site -SSO conduct tailgate safety meeting by reviewing Health&Safety Plan (HASP), Vehicle Safety, Job Safety <br /> Safety Officer(SSO) Analysis(JSA), and Traffic Control Plan <br /> - Must review Health and -Sign compliance agreement to comply with HASP/JSA <br /> Safety Plan(HASP) -Only properly trained personnel should be allowed to operate equipment <br /> -Operators must follow equipment manufacturer guidelines during operation <br /> Set-up for sampling - Pedestrians -Wear nitrile gloves when sampling—replace often;wear leather gloves when moving equipment <br /> and wrap-up of -Traffic - Use proper lifting techniques <br /> sampling activities - Lifting heavy objects -Obtain assistance when lifting>50 Ibs—do not lift alone <br /> when complete - Pinch Points - Use appropriate tools and sample containers <br /> -Verify sample labels for accuracy prior to placing in cooler containing ice <br /> -Wear appropriate PPE Level D <br /> Purge wells, collect, - Pedestrians -Wear nitrile gloves when sampling—replace often;wear leather gloves when moving equipment <br /> label, and package -Traffic - Use proper lifting techniques <br /> samples for shipment - Lifting heavy objects -Obtain assistance when lifting>50 Ibs—do not lift alone <br /> - Pinch Points - Use appropriate tools and sample containers <br /> -Verify sample labels for accuracy prior to placing in cooler containing ice <br /> -Wear appropriate PPE(Level D) <br /> -Set-up Traffic Control to delineate the work area <br /> - Look and listen for signs of vehicular traffic <br /> Disposal of - Lifting -Wear nitrile gloves—replace often <br /> Investigation Derived - Heavy equipment -Wear leather gloves when transporting containment drums <br /> Waste(IDW) - Pinch points -Watch hand/finger positioning when opening/closing/transporting drums <br /> - Uneven surfaces - Use appropriate tools for opening/closing/transporting drums—ratchet/dolly <br /> -Slip,trip, and fall hazards - Lift heavy objects using leg strength and proper posture <br /> -Obtain assistance when lifting>50 Ibs—do not lift alone <br /> - If possible, use power lift truck,drum dolly, and/or other mechanical methods to transport drums to a <br /> staging area <br /> - Place drum label on waste containers identifying contents, contents origin, contact person, contact number, <br /> and generation date <br /> Inspection Requirements Training Requirements <br /> Hand tools sample containers Site specific health and safety plan <br /> PPE Hazwoper(40 hr, 8 hr, Medical Exam) <br /> Respiratory protection,fit test, medical clearance <br /> Hearing protection <br /> Air Monitoring Requirements ® Not Applicable H <br /> Parameter Monitoring Zone/Location Action Level Action <br /> Stop work. If reading is continued above <br /> VOC(Total by PID) Breathing Zone/Work Area >background background after letting the well further <br /> ventilate,the well is to be re-closed and the <br /> Site Safety Officer is to be contacted. <br /> Printed Name Signed Name Company Date <br />