Laserfiche WebLink
Task Hazard Assessment AECOM °e;vered: <br /> Summa Canister Sampling 01-01-22-04 <br /> job/taskREMINDER: Use 4-Sight at the start of, and continuously throughout the additional <br /> Job Steps Potential Hazards Risk Critical Actions To Mitigate Hazards Risk <br /> List all steps required to perform How could you be hurt? (initial) List control measures required to eliminate, control or protect against the (final) <br /> a task in the sequence they What would the injury be? potential hazards associated with each job step to minimize the risk of <br /> are performed injury or environmental impact. Identify any`Stop Work'triggers. <br /> 2b.Injury from poor ergonomics 6 2b.Maintain proper body positioning/good ergonomic form. Avoid stooping and twisting. 2 <br /> On- <br /> Site <br /> Edits: <br /> 3. Pack Sample Cooler 3a.Muscle strain 6 3a.Use proper lifting techniques(lift with legs, not back)and use buddy system if lifting 2 <br /> items>50 pounds. Avoid twisting, stooping, and/or extended reaching body positions <br /> when moving full coolers. <br /> JOn- <br /> Site <br /> dit <br /> Additional <br /> DCSA Task Hazard Assessment Form <br /> Version 1—October 22,2018 2 of 3 <br />