My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM <br /> • Utilize insulated links and polypropylene tag lines.These prevent the transmission of electricity <br /> to loads or tag line handlers if an electrical line is contacted. <br /> NOTE: These additional safeguards are intended as supplemental protection. Use of these <br /> measures is not permissible as a substitute for maintaining the safe working distance or <br /> implementation of the procedures outlined in this document. <br /> 4.6 Emergency Planning <br /> 4.6.1 Managers shall complete a location specific emergency response plan as part of their location or <br /> project specific SH&E Plan for all operations during which equipment is operated within 50 feet <br /> (15.25 meters)of an energized overhead electrical line or conductor. Refer to S3AM-010-PR1 <br /> Emergency Response Planning.This plan shall identify the following information: <br /> • The importance to the operator's safety of remaining inside the cab except where there is an <br /> imminent danger of fire, explosion, or other emergency that necessitates leaving the cab. <br /> • The safest means of evacuating from equipment that may be energized. <br /> • The potentially energized zone around the equipment. <br /> • The need for crew in the area to avoid approaching or touching the equipment and the load. <br /> • The means to de-energize the electrical line or live conductor. <br /> • The contact information for the utility Overhead Electrical Line Owner/Operator and <br /> emergency services. <br /> 4.6.2 In the event of an incident,the Employee shall report it in accordance with S3AM-004 PR1 Incident <br /> Reporting, Notifications&Investigation. <br /> 4.6.3 All damaged utilities shall be repaired by a qualified and/or licensed professional. <br /> 5.0 Records <br /> 5.1 Retain the Overhead Electric power lines Acknowledgement forms and any document related to requests of <br /> and confirmation from the Overhead Electrical Line Owner/Operator in the project files. Documentation of <br /> employee training completed shall be retained in accordance with S3AM-003-PR1 SH&E Training. <br /> 6.0 Attachments <br /> 6.1 S3AM-322-FM1 Overhead Electric Power Lines Acknowledgement Form <br /> Overhead Lines&Obstructions(S3AM-322-PR1) <br /> Revision 3 July 31,2019 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. 8 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.