My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A=COM <br /> • Confirm an equipment maintenance inventory is maintained, schedules adhered to and <br /> appropriate inspections of equipment are conducted. <br /> • Confirm subcontractors are properly pre-qualified in accordance with S3AM-213-PR1 <br /> Subcontractor Management. <br /> • Require that subcontractor employees follow established safety procedures in operation, <br /> inspection, and maintenance of vehicles and equipment. <br /> • Inform AECOM and subcontractor machinery operators about applicable local regulations <br /> restricting the consecutive minutes of engine idling time allowed. <br /> • Confirm subcontractor machinery and mechanized equipment is approved for use in <br /> accordance with the requirements of S3AM-309-FM1 Approval of Machinery&Mechanized <br /> Equipment. <br /> • Confirm that all rented equipment bears any required current certification marks and arrives in <br /> proper working order with the manufacturer's operating manual before acceptance from the <br /> supplier. <br /> • Confirm that AECOM and subcontractor machinery and mechanized equipment is certified, as <br /> applicable, in accordance with manufacturer specifications and/or regulatory requirements. <br /> • Visually observe the subcontractors'vehicles and equipment,for any unsafe conditions or <br /> practices. Equipment or operation not in compliance with applicable safety standards is <br /> prohibited. <br /> 4.1.2 Employees/Ground Personnel <br /> • Confirm that all rented equipment arrives in proper working order with the manufacturer's <br /> operating manual before acceptance from the supplier. <br /> • Ground personnel when working in the vicinity of heavy equipment shall have received <br /> training, and comply with the applicable rules of engagement. <br /> 4.1.3 Operators(of heavy equipment) <br /> • Operate the equipment safely, maintain full control of the equipment, and comply with <br /> manufacturer's operation manual and the laws governing the operation of the equipment. <br /> • Inspect equipment and immediately report defects and conditions affecting the safe operation <br /> of the equipment to the appropriate Supervisor. <br /> • Trainees may operate equipment in accordance with jurisdictional requirements and under the <br /> direct supervision of a trainer. <br /> 4.2 Communication <br /> 4.2.1 Communication between site Managers/Supervisors, heavy equipment Operators, and site <br /> Employees/Ground Personnel is a key method of preventing serious injury or death during heavy <br /> equipment operations. <br /> 4.2.2 Managers shall confirm the Industrial site or project specific SH&E Plan is developed and <br /> communicated to all affected and involved employees. Refer to S3AM-209-PR1 Risk Assessment <br /> &Management. <br /> 4.2.3 Task Hazard Assessments and Daily Tailgate meetings shall be conducted in accordance with <br /> S3AM-209-PR1 Risk Assessment&Management. <br /> 4.2.4 Concerning worksites in which other employers control concurrent operations and SH&E issues <br /> related to the worksite, the manager shall coordinate with those conducting concurrent operations <br /> to confirm appropriate control measures are in place to protect employees from the hazards <br /> associated with activities to be performed. <br /> Heavy Equipment(S3AM-309-PR1) <br /> Revision 6 July 31,2019 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 2 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.