Laserfiche WebLink
A=COM <br /> 5.1 Retain completed S3AM-331-FM1 Underground Utility&Subsurface Installation Clearance Checklist and <br /> documents related the clearance process(e.g. Utility Owner communication, etc.)in the site or project files. <br /> 5.2 Documentation of employee training completed shall be retained in accordance with S3AM-003-PR1 SH&E <br /> Training. <br /> 6.0 Attachments <br /> 6.1 S3AM-331-ATT1 One-Call System <br /> 6.2 S3AM-331-ATT2 Underground Utilities&Subsurface Installation Flow Chart <br /> 6.3 S3AM-331-FM1 Underground Utility&Subsurface Installation Clearance Checklist <br /> Underground Utilities(S3AM-331-PR1) <br /> Revision 2 September 30,2020 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 8 of 8 <br />