Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control 9 sites <br /> Attachment F: Site Safety Orientation <br /> AECOM will conduct a site safety briefing for a person's initial visit to the site. The briefing will be conducted: <br /> ■ Prior to the start of work, <br /> ■ For any new AECOM or subconsultant personnel, <br /> ■ For Site Visitors, and <br /> ■ At each mobilization, or whenever there is a change in task or significant change in task location. <br /> All personnel working on the project who have received the site briefing(including the SWP review)will sign the Personal <br /> Acknowledgement located in Section 18.Visitors may receive a shortened version to address the hazards specific to their visit. <br /> The following topics,at minimum, will be discussed during the site safety briefing: <br /> ■ Contents of this SWP, <br /> ■ The Emergency Response Plan (Attachment 1), <br /> ■ Contractor SHE Management expectations, <br /> ■ Injury management, including notification and hospital and occupational clinic locations, <br /> ■ The AECOM 4-Sight program, <br /> ■ Stop Work authority, <br /> ■ The THAs(Attachment C)for the activities that will be performed on a given job, <br /> ■ Types of hazards at the site and means for minimizing exposure to them, <br /> ■ Instructions for new operations to be conducted, and safe work practices, <br /> ■ PPE that must be used, <br /> ■ Lone worker check-in procedures, <br /> ■ Emergency evacuation routes, muster points, and tornado/storm shelter, and <br /> ■ Location and use of emergency equipment. <br /> These briefings must be documented and maintained in the project files. <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />