My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A4OM <br /> • Tubing • Safety cutting tools <br /> • Water • Rubber mallet <br /> 2.4.1 Sample Train Assembly • Wire brush <br /> • '/4" OD tubing cap or Swagelok® cap <br /> • Pry bar <br /> or equivalent <br /> • Wrenches (7/16, '/2, 9/16, 5/8) <br /> • Teflon®tubing (laboratory-grade) — • Steel measuring tape <br /> 1/8" ID -'/4" OD • Hand Auger (optional) <br /> • Tygon®tubing (laboratory-grade) — • Push rig/Slam bar (optional) <br /> 3/16" ID —3/8" OD 2.7 RECORDKEEPING SUPPLIES <br /> • '/4 " OD Teflon tubing Digital camera or phone with camera <br /> • Stainless steel tubing - '/4 " OD • <br /> • Logbook <br /> • 1/8" OD to %" ID Swagelok® Reducer . Ultra-fine permanent marker <br /> • Attached to either 15 ml Hand Pump, . Soil vapor sampling field sheets and/or <br /> battery operated pump, or Tedlar Bag field computer <br /> 2.5 TRACER 2.8 SHIPPING SUPPLIES <br /> • Tracer liquid (isopropyl alcohol) UN boxes <br /> • Clean towel and/or rage • Shipping Shi in labels <br /> • Plastic bag 9 Hazard labels <br /> 2.6 TOOLBOX • Packing tape <br /> • Ratchet set (1/2, 9/16, 5/8, 3/4, 7/8, <br /> 15/16) <br /> 3 LOCATIONS AND DEPTH OF SAMPLES <br /> Prior to mobilization: <br /> • Verify access has been granted (when applicable) to site for the period necessary for <br /> installation and sampling. <br /> The location of the soil gas sampling points will reflect the site characteristics, source <br /> locations, receptors of concern and potential pathways of exposure. Additionally, the depths <br /> and timing will be selected to maximize the effective collection of soil gas concentrations. <br /> 3.1 RAINFALL <br /> Sampling events will consider sampling after dry weather so that a maximum soil gas <br /> concentration will be represented. If a significant rainfall event of greater that 0.5 inches <br /> occurs, sampling should not be conducted for at least 5 days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.