My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 2:32:59 PM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
616
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cleanup in Vulnerable Communities'Initiative Final Project Reference:Bobson Cleaners <br /> Discovery and Enforcement Discovery Project Number:60688620-5.1 <br /> Investigation Work Plan <br /> Role Name Telephone Number <br /> DTSC CVCI-D&E Coordinator Julian Grijalva, PE 559-578-8174 <br /> DTSC Project Manager Arielle McLeskey 916-255-3631 <br /> DTSC Geologist Natasha DiPietro,P.G. (714)-484-5330 <br /> DTSC Toxicologist Alicia Taylor (510)529-7201 <br /> AECOM Program Manager* Ed Tarter (916)216-6125 <br /> AECOM Project Manager Wanda Farmer (843)209-1534 <br /> AECOM Quality Assurance Manager Stacy Louie (916)414-5810 <br /> AECOM Risk Assessor Catherine Schwach (415)816-2778 <br /> AECOM Health&Safety Manager Shannon Couch (510)277-5369 <br /> Laboratory Representative Monica Tran (916)605-3408 <br /> Laboratory Quality Assurance Officer Christopher Davis (650)219-6399 <br /> "The work performed pursuant to this CVCI-D&E Work Plan will be under the direction and supervision of the consultant's project <br /> manager who is a qualified California registered professional engineer(PE)and/or professional geologist(PG)in compliance with <br /> the requirements of the Professional Engineers Act, Business and Professions Code Sections 6700-6899 and Section 7838,and the <br /> Geologist and Geophysicists Act,Business and Professions Code sections 7800-7887. <br /> 1.3 Work Plan Organization <br /> This Work Plan is organized as follows. <br /> • Section 1 presents an introduction and the overall objectives of the DI process. <br /> • Section 2 presents a discussion of site background research conducted in the preparation of the Work Plan. <br /> • The Sampling and Analysis Plan, included as Section 3, presents a discussion of planned field data collection <br /> activities and laboratory analytical techniques that will be used to evaluate environmental conditions at the Site. <br /> • The Quality Assurance Program Plan (QAPP) presented in Section 4 describes quality assurance(QA)and <br /> quality control (QC)measures to be used during project execution to provide an appropriate level of assurance <br /> that the data collected during the CVCI-D&E meet project data quality objectives(DQOs)to support risk-based <br /> decisions regarding Site acceptability. <br /> • The procedure for dealing with potential field variances is described in Section 5. <br /> • Field health and safety procedures are discussed in Section 6. <br /> • The planned Screening Risk Evaluations is described in Section 7. <br /> • The planned DI Report Preparation is addressed in Section 8. <br /> • The proposed work schedule is presented in Section 9. <br /> • References for this Work Plan are listed in Section 10. <br /> • A site-specific addendum to the Programmatic Health and Safety Plan (HASP)is included as Appendix A. <br /> • Additional pertinent information that deviates from the standard operating procedures (SOPS)in the approved <br /> Programmatic QAPP is provided in subsequent appendices. <br /> Prepared for: Department of Toxic Substances Control AECOM <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.