Laserfiche WebLink
Cleanup in Vulnerable Communities'Initiative Final Project Reference:Bobson Cleaners <br /> Discovery and Enforcement Discovery Project Number:60688620-5.1 <br /> Investigation Work Plan <br /> 5. Field Variances <br /> As field conditions may not be as anticipated, it may become necessary to implement modifications to the Work Plan <br /> that is presented in this Work Plan. Field personnel will notify the AEOCM project manager when deviations from this <br /> Work Plan appear necessary.The DTSC project manager will be notified of the proposed modifications, and a verbal <br /> (for minor modifications)or written (for major modifications)approval will be obtained from the DTSC before <br /> implementing the modifications. Modifications to the approved Work Plan will be documented in the field forms and in <br /> the CVCI-D&E report. <br /> If additional characterization of the Site, beyond that set forth in this Work Plan, becomes necessary due to <br /> encountered conditions, an addendum to this Work Plan will be prepared to document the encountered conditions <br /> and to provide the procedures and rationale for the planned additional characterization. <br /> Prepared for: Department of Toxic Substances Control AECOM <br /> 28 <br />