My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
600
>
2900 - Site Mitigation Program
>
PR0548753
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 11:33:41 AM
Creation date
3/2/2026 11:15:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548753
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027916
FACILITY_NAME
BOBSON CLEANERS, INC.
STREET_NUMBER
600
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22314117
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
600 N MAIN ST MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Health & Safety Plan r <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> — Qualified/trained operators, competent person, pre-use operations inspections(S3AM-309-FM02)and THA required. <br /> Follow the requirements in S3AM-309-PR1. <br /> ❑X Highway and Road Work—Working On or Near Highways, Roadways, Driveways, Parking Lots <br /> — Traffic control or protection plan, person knowledgeable of traffic control to review plan, review of safe work practices <br /> for roadway workers(S3AM-306-ATT3)and THA required. Follow the requirements in S3AM-306-PR1. <br /> ❑X Overhead Lines and Obstructions <br /> Visual verification of overhead lines prior to start of work and THA required. Follow the requirements in S3AM-322-PR1. <br /> ❑X Underground Utilities <br /> — Site walk, completion of the Underground Utilities and Subsurface Installations checklist(S3AM-331-FM1)and THA <br /> required. Follow the requirements in S3AM-331-PR1. <br /> ❑X Security—Threat of Violence(Working in areas where there is a treat of violence,civil unrest or working in a high <br /> crime area) <br /> — Follow the requirements in the AECOM Operational Security Plan Instruction-SR1-002-W11. <br /> 2.6 Physical and Biological Hazards <br /> Physical and biological hazards are hazards that threaten the physical safety of an individual; contact with the hazard typically <br /> results in an incident or injury.The following table summarizes the physical and biological hazards present at the site and the <br /> associated procedures that address protection and prevention of harm. <br /> If a there is a potential of physical or biological hazard when performing a specific task, it must be addressed in the <br /> THA. <br /> All checked procedures MUST be included in Attachment D for implementation and reference. The following hazards and their <br /> site-specific description are anticipated based on the scope of work and project site: <br /> Hazard/Activity Site Specific Description Applicable <br /> (Note: Text in this column links . . Procedure <br /> ❑X Concrete Work(Competent Person required) Well grouting S3AM-338-PR1 <br /> ❑X Driving Safety Mobilization to,travel on and demobilization from S3AM-005-PR1 <br /> site <br /> ❑X Drilling, Boring and Direct Push Probing Drilling boreholes for groundwater monitoring well S3AM-321-FM1 <br /> installation and soil gas probe installation S3AM-321-PR1 <br /> ❑X Hand Safety Continuous exposure to a variety of hand hazards S3AM-317-PR1 <br /> during field tasks <br /> ❑X Heat Stress Continuous exposure when ambient air temperature S3AM-113-PR1 <br /> is above 80°F(26.6°C)and a standard work uniform <br /> is worn or when ambient air temperature is above <br /> 70°F(21.1°C)and impermeable chemical protective <br /> clothing is worn. <br /> ❑X Heavy Equipment—Working with/Operating Heavy Equipment will be used for drilling the S3AM-309-FM02 <br /> or Working near Heavy Equipment, Mobile boreholes for groundwater monitoring well S3AM-309-PR1 <br /> Equipment or Drill Rigs installation and soil gas probe installation <br /> ❑X Noise(Competent Person required) Exposure during drilling works S3AM-118-PR1 <br /> ❑X Non-Ionizing Radiation Frequent exposure to sunlight during daylight hours S3AM-121-PR1 <br /> ❑X Overhead Lines S3AM-322-PR1 <br /> ❑X Pandemic Virus Continuous exposure SR1-003-PR2 <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) 4 <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />
The URL can be used to link to this page
Your browser does not support the video tag.